The SCA Design Standards are intended to guide the design of new construction and existing building rehabilitation for New York City public schools. They are comprised of four major groups: Design Requirements, Standard Specifications, Standard Details, and Room Planning Standards. In addition to these major groups, other design standards include the NYC Green Schools Guide, procedural guidelines, and other information to be used by the design community for working on New York City public schools.
Page Contents
Page Contents
Design Requirements
The Design Requirements define the acceptable and expected design practice for SCA consultants and in-house Architects and Engineers, and are generally organized by discipline and building system. Each requirement under "Description/Design Approach" may meet or exceed applicable code requirements.
For the list of deviations requested by designers that were not accepted, please click here.
The Design Requirements can be viewed in their entirety or each technical division can be seen individually. When the PDF is opened, you can save it to your desired destination for future reference; File --> Save As. On the left side are the Bookmarks that allow you to jump to the desired section or page. For your convenience, you can also print specific sections from the Bookmark column; Right Mouse Click on the specific section and select Print Page(s).
To view the Design Requirements, you must have Adobe Acrobat Reader installed on your computer. If you do not have Adobe Acrobat Reader installed, follow the link below to install the latest version of Adobe Acrobat Reader.
The 2022 NYC Construction Codes were effective as of November 7, 2022. For the complete set of Design Requirements issued prior to the 2022 code revisions, please click the Pre-2022 NYC Construction Codes Standards Page link.
The Standard Details are to be used as an aid in creating Contract Documents and are based on the SCA Standard Specifications and Design Requirements. They are to be modified to suit actual project conditions.
In order to view the Standard Details, you must have a working version of Adobe Acrobat Reader installed. You may download the latest viewer for free by following this link: Adobe Acrobat Reader.
To download AutoCAD *.dwg files, please go click the 'Downloads' link in the page contents section and under the Standard Details section, you can download and extract each group in its entirety.
The 2022 NYC Construction Codes were effective as of November 7, 2022. For the complete set of Standard Details issued prior to the 2022 code revisions, please click on the Pre-2022 NYC Construction Codes Standards Page link in page contents.
The Room Planning Standards provide the design basis for all spaces in New York City Public Schools, including all intended equipment and general locations of furnishings. They clearly delineate those items to be provided by the contractor and those by the Authority. They require modification based on actual (as designed) room layout and size, and for existing rooms may end up being modified due to space and program constraints.
The following table lists changes the designer is to make to the indicated Room Planning Standards that have not been incorporated as of yet into the Drawings. Many times changes are made to one series of drawings that may also apply to others. Our intent is not to issue new RPS until all known modifications are incorporated. Until the new RPS is complete, please use the matrix below to modify project drawings (based on the current RPS).
Matrix of Changes to Existing RPS
The following link lists changes the designer is to make to the indicated Room Planning Standards that have not been incorporated as of yet into the Drawings. Many times changes are made to one series of drawings that may also apply to others. Our intent is not to issue new RPS until all known modifications are incorporated. Until the RPS is revised, please use the matrix to modify the published RPS for use on the project.
The following link lists new spaces that may be included in a POR for which a room layout has not been issued. These new spaces are typically a combination of published RPS layouts or a reduced floor area. Also included in the matrix are the intended finishes and furniture to be used for the space.
In order to view the Room Planning Standards, you must have a working version of Adobe Acrobat Reader installed. You may download the latest viewer for free by following this link: Adobe Acrobat Reader.
To download AutoCAD *.dwg files, please go to the Downloads page and under the Room Planning Standards section, you can download and extract each Group in it's entirety.
The Standard Specifications define the materials acceptable for use in New York City Public Schools, and are based on and complement the Design Requirements. For projects that have a system that is not included in the specification, the designer is to create the section based on the formatting. Deviations from the standards on capacity projects must be approved through the Deviations Committee.
During construction submittal review, Designers are to review materials/products for their projects based on the performance criteria included in the specifications. Those items listed in the specifications can meet the performance criteria but “or Equal” products are permitted to be submitted by the Contractor as per the General Conditions and are to be reviewed by designers. Refer to Procedural Guideline 5.3.1. For a list of products that have been deemed by the Authority to not be considered “or Equal” and are thus not to be approved on a project, please click on the following link: “List of Products Deemed Not Equal”. Designers are also to ensure they do not include the items from the list in their design specifications when creating project specifications.
The Standard Specifications are available in Word format and are to be edited as applicable for all projects.
General Requirements in Division 1 are not to be changed, revised, edited or omitted for projects.
Supplementary Requirements in Division 1 are to be edited as required for the project.
In order to view the Standard Specifications, you must download it.
The 2022 NYC Construction Codes were effective as of November 7, 2022. For the complete set of Standard Specifications issued prior to the 2022 code revisions, please scroll down to the Pre-2022 NYC Construction Codes Standards Section.
All Drawings prepared for the SCA shall use the Standard Title Sheets to ensure consistency in presentation for all projects. The Designer shall use the appropriate sheet size and border for the project, with 24½"x 36½" being the preferred size.
In order to view the Standard Title Sheets, you will need a PDF reader installed on your machine. If you do not already have it, you can download one free of charge from Adobe's website by clicking the following link: Adobe PDF Reader.
Text To Be Inserted Into Title Block for 'E1' Size Sheet -Side Title Block
11-29-2024
AE2024-10
Pre-2022 NYC Construction Codes Standards Page
Design Requirements
Room Layouts
Specifications
[ - NO SECTION SELECTED - ]
Design Documents Design Standards The SCA Design Standards are intended to guide the design of new construction and existing building rehabilitation for New York City public schools. They are comprised of four major groups: Design Requirements, Standard Specifications, Standard Details, and Room Planning Standards. In addition to these major groups, other design standards include the NYC Green Schools Guide, procedural guidelines, and other information to be used by the design community for working on New York City public schools. SCA Design Standards Design Requirements The Design Requirements define the acceptable and expected design practice for SCA consultants and in-house Architects and Engineers, and are generally organized by discipline and building system. Each requirement under "Description/Design Approach" may meet or exceed applicable code requirements.For the list of deviations requested by designers that were not accepted, please click here.The Design Requirements can be viewed in their entirety or each technical division can be seen individually. When the PDF is opened, you can save it to your desired destination for future reference; File --> Save As. On the left side are the Bookmarks that allow you to jump to the desired section or page. For your convenience, you can also print specific sections from the Bookmark column; Right Mouse Click on the specific section and select Print Page(s).To view the Design Requirements, you must have Adobe Acrobat Reader installed on your computer. If you do not have Adobe Acrobat Reader installed, follow the link below to install the latest version of Adobe Acrobat Reader.The 2022 NYC Construction Codes were effective as of November 7, 2022. For the complete set of Design Requirements issued prior to the 2022 code revisions, please click the Pre-2022 NYC Construction Codes Standards Page link.Complete List of Design Requirements0.0 - Cover0.3 - Table of Contents1.0 - General2.0 - Site Construction3.0 - Structural4.0 - Building Envelope5.0 - Interiors6.0 - Mechanical Services7.0 - Electrical and Communication Services8.0 - Sustainability And ResiliencyComplete Set of Design Requirements Standard Details The Standard Details are to be used as an aid in creating Contract Documents and are based on the SCA Standard Specifications and Design Requirements. They are to be modified to suit actual project conditions.In order to view the Standard Details, you must have a working version of Adobe Acrobat Reader installed. You may download the latest viewer for free by following this link: Adobe Acrobat Reader.To download AutoCAD *.dwg files, please go click the 'Downloads' link in the page contents section and under the Standard Details section, you can download and extract each group in its entirety.The 2022 NYC Construction Codes were effective as of November 7, 2022. For the complete set of Standard Details issued prior to the 2022 code revisions, please click on the Pre-2022 NYC Construction Codes Standards Page link in page contents.Complete list of standard details Detail NumberDetail TitleIssue Or Last Revision DateLatest Bulletin No01000 - General0100000a8 1/2" X 11" Border Sheet - Portrait02-09-2009SD09-010100000b8 1/2" X 11" Border Sheet - Landscape02-09-2009SD09-010100000c11" X 17" Border Sheet - Portrait02-09-2009SD09-010100000d11" X 17" Border Sheet - Landscape02-09-2009SD09-010100000g24 X 36 Border Sheet - Bottom Title Block11-29-2024AE24-100100000h24 X 36 Border Sheet - Side Title Block11-29-2024AE24-100100000k30 X 42 Border Sheet - Bottom Title Block11-29-2024AE24-100100000l30 X 42 Border Sheet - Side Title Block11-29-2024AE24-100100001aGeneral Notes03-29-2024SD24-010100002aBuilding Department Notes (1968 Building Code-CIP Projects)02-28-2023SD23-010100002bBuilding Department Notes (1968 Building Code-CIP Projects)02-28-2023SD23-010100003aBuilding Department Notes (2022 Construction Codes-New Buildings/Additions)11-30-2022SD22-040100003bBuilding Department Notes (2022 Construction Codes-New Buildings/Additions)11-30-2022SD22-040100003cSite Safety Notes11-30-2022SD22-040100004aSpecial Inspections10-31-2023SD23-030100005aProgress Inspections02-28-2023SD23-010100006aEnergy Code Compliance Progress Inspections - 2020 NYC Energy Conservation Code10-31-2023SD23-030100006bEnergy Code Compliance System Commissioning 2020 NYC Energy Conservation Code11-30-2022SD22-040100007aAbbreviations11-01-2010SD10-020100007bAbbreviations11-01-2010SD10-020100008aDrafting Symbols11-01-2010SD10-020100009aReference Symbols11-01-2010SD10-020100010aMounting Height Diagram08-30-2024SD24-020100010bAccessible Plumbing Fixtures and Accessories Mounting Heights and Locations08-30-2024SD24-020100011aZoning Data12-05-2014SD14-020100012aFurniture And Equipment Schedule11-01-2010SD10-020100013aDoor Schedule11-30-2022SD22-040100014aStair & Door Capacity Tables (1968 Building Code)11-01-2010SD10-020100014bStair and Door Capacity Tables (2022 Building Code)11-30-2022SD22-040100015aRoom Finish Schedule11-01-2010SD10-020100016aColor Schedule11-01-2010SD10-020100017aSuspended Ceiling Schedule (1968 Building Code)11-01-2010SD10-020100017bSuspended Ceiling Schedule (2022 Building Code)11-30-2022SD22-040100018aWindow and Glazing Schedule11-30-2022SD22-040100018bWindow Guard And Security Screen Schedule11-30-2022SD22-040100018cWindow and Glazing Schedule11-30-2022SD22-040100019aPlanting Schedule11-01-2010SD10-020100020aSignage Schedule11-30-2022SD22-040100021aPublic Art for Public Schools (PAPS) Notes05-31-2023SD23-020100021bPublic Art for Public Schools (PAPS) Notes05-31-2023SD23-020100022aList of Drawings Table and Subsequent Applications Table02-28-2023SD23-010100023aPublic Art for Public Schools (PAPS) Notes - CIP Projects12-29-2023SD23-040100030aADA reference Drawing For Fixtures and Building Elements' Clearance Requirements07-31-2017SD17-010100030bADA reference Drawing For Fixtures and Building Elements' Clearance Requirements11-07-2022SD22-030100031aZone of Public Protection - Plan11-30-2022SD22-040100031bZone of Public Protection - Sections11-30-2022SD22-040100031cZone of Public Protection Plan - Building Code Requirements11-30-2022SD22-040100031dZone of Public Protection Sections- Building Code Requirements11-30-2022SD22-040100050aFoundation Notes (1968 Building Code - CIP Projects)12-29-2023SD23-040100051aSuperstructure Notes (1968 Building Code - CIP Projects)12-29-2023SD23-040100051bSuperstructure Notes (1968 Building Code - CIP Projects)12-29-2023SD23-040100051cSuperstructure Notes (1968 Building Code - CIP Projects)12-29-2023SD23-040100051dSuperstructure Notes (1968 Building Code - CIP Projects)12-29-2023SD23-040100052aFoundation Notes (2022 Building Code - New Buildings)11-30-2022SD22-040100053aSuperstructure Notes (2022 Building Code - New Buildings)11-30-2022SD22-040100053bSuperstructure Notes (2022 Building Code - New Buildings)11-30-2022SD22-040100053cSuperstructure Notes (2022 Building Code - New Buildings)11-30-2022SD22-040100053dSuperstructure Notes (2022 Building Code - New Buildings)11-30-2022SD22-040100053eSuperstructure Notes (2022 Building Code - New Buildings)11-30-2022SD22-040100054aEarthquake Design Data (2022 Building Code - New Buildings)11-30-2022SD22-040100055aStructural Abbreviations11-01-2018SD18-050100060aStandard Cover Sheet05-01-2024AE24-030100061aStandard CIP Project Notes12-29-2023SD23-040100062aStandard CIP Project Notes11-30-2022SD22-040100062bStandard CIP Project Notes11-30-2022SD22-040150006aTemporary Construction Fence And Gate11-30-2022SD22-04 01 - General and Supplementary Requirements Detail NumberDetail TitleIssue Or Last Revision DateLatest Bulletin No 02511 - Asphaltic Concrete Paving0251101aAsphalt Pavement Detail - Pedestrain11-01-2013SD13-04 0251101bAsphalt Pavement Detail - Vehicular/Open Playground11-01-2013SD13-04 02513 - Sidewalk And Street Paving0251300aHighway Paving Plan11-30-2012SD12-03 0251301aSidewalk / Steel Faced Street Curb - Details And Elevation11-01-2013SD13-04 0251301bStreet Paving Key - Detail11-01-2013SD13-04 0251302aSidewalk / Pedestrian Ramps - Plans11-01-2013SD13-04 0251302bSidewalk / Pedestrian Ramp - Section and Notes03-29-2019SD19-02 0251302cSidewalk / Pedestrian Ramp - Plan , Elevation and Details11-01-2013SD13-04 0251303aSidewalk / Driveway Curb Cut - Layout, Notes, and Detail03-29-2019SD19-02 0251304aSidewalk / Street Tree Pit - Plan And Section11-30-2012SD12-03 0251305aSidewalk/Hydrant Fender - Layout And Section (Existing Hydrant In Undisturbed Soil)11-01-2013SD13-04 0251305bSidewalk/Hydrant Fender - Layout And Section (New Hydrant Installations In Fresh Backfill)11-01-2013SD13-04 0251306aStreet Paving / Existing Catch Basin - Plan11-30-2012SD12-03 0251307aSidewalk w/ Permeable Pavers / Street Tree Pit - Sizing table11-30-2012SD12-03 0251307bSidewalk w/ Permeable Pavers / New Street Tree Pit - Plan11-30-2012SD12-03 0251307cSidewalk w/ Permeable Pavers / New Street Tree Pit - Longitudinal Section11-30-2012SD12-03 0251307dSidewalk w/ Permeable Pavers / New Street Tree Pit - Cross Sections11-30-2012SD12-03 0251307eSidewalk w/ Permeable Pavers / New Street Tree Pit - Permeable Paving Area Edging11-30-2012SD12-03 0251307fSidewalk w/ Permeable Pavers / New Street Tree Pit - Permeable Paving Area Edging Detail11-30-2012SD12-03 0251307gSidewalk w/ Permeable Pavers - 5% -15% Slope - Longitudinal Section11-30-2012SD12-03 0251308aSidewalk w/ Permeable Pavers - Enlargement at Existing Tree11-30-2012SD12-03 0251309aSidewalk w/ Permeable Pavers - Without Tree Pits- Cross Section11-30-2012SD12-03 02521 - Concrete Curbs And Pavements0252101aConcrete Curb and Fence Post Footing Details12-30-2022SD22-05 0252101bConcrete Curb w/o Fence Details12-30-2022SD22-05 0252102aConcrete Pavement on grade12-30-2011SD11-04 02531 - Resilient Surfacing0253101aTrack Details - Typical Resilient Surface Over Asphalt Pavement07-31-2017SD17-01 0253101bTrack Details - Typical Cross Section07-31-2017SD17-01 0253102aLong/Triple Jump/Pole Vault Layout07-31-2017SD17-01 0253102bLong Jump Details - Sand Pit Landing Area07-31-2017SD17-01 0253102cLong Jump Details - Runway Connection to Sand Pit Landing Area07-31-2017SD17-01 0253102dPole Vault Layout07-31-2017SD17-01 0253102ePole Vault Details - Pole Vault Box12-05-2014SD14-02 0253102fPole Vault Details - Pole Vault Pad Connection to Synthetic Turf07-31-2017SD17-01 0253102gPole Vault Details - Pole Vault Pad Connection to Runway07-31-2017SD17-01 0253103aHigh Jump Layout12-05-2014SD14-02 0253103bHigh Jump Details - Landing Area, Typical Asphalt Surface07-31-2017SD17-01 0253104aShot Put Layout and Shot put Circle Detail07-31-2017SD17-01 02541 - Synthetic Turf - TPE Infill0254101aSynthetic Turf - Typical Section at Field07-31-2017SD17-01 0254101bSynthetic Turf at Track edge (With Slot Drain) - Detail07-31-2017SD17-01 0254101cSynthetic Turf at Track edge - Detail11-01-2013SD13-04 0254101dSynthetic Turf at Wall - Detail11-01-2013SD13-04 0254101eSynthetic Turf at Clay/Skinned Area - Detail07-31-2017SD17-01 0254101fSynthetic Turf at Natural Lawn - Detail07-31-2017SD17-01 02580 - Track/Court/Playground Markings0258001aBaseball Field Layout - Synthetic Turf12-05-2014SD14-02 0258001bBaseball Field Layout - Grass12-05-2014SD14-02 0258001cBaseball Field Details - Home Plate12-05-2014SD14-02 0258001dBaseball Field Details - Pitcher's Circle12-05-2014SD14-02 0258002aSoftball Field Layout - Grass12-05-2014SD14-02 0258002bSoftball Field Details - Home Plate12-05-2014SD14-02 0258002cSoftball Field Details - Pitcher's Circle12-05-2014SD14-02 0258003aFootball Field Marking Layout11-01-2013SD13-04 0258003bFootball Field Details - Sideline Detail11-01-2013SD13-04 0258003cFootball Field Details - Kick-Off Marker11-01-2013SD13-04 0258003dFootball Field Details - Extra Point Line11-01-2013SD13-04 0258003eFootball Field Details - Inbound Line Detail11-01-2013SD13-04 0258003fFootball Field Details -Yardline Numbers11-01-2013SD13-04 0258003gFootball Field Details - Coaches Box11-01-2013SD13-04 0258004aBasketball Court Layout - High School12-05-2014SD14-02 0258004bBasketball Court Layout - PS/IS (Option)01-31-2018SD18-01 0258004cBasketball Court Layout - Half Court12-05-2014SD14-02 0258005aHandball Court Layout12-05-2014SD14-02 0258005bHandball Wall Elevation12-05-2014SD14-02 0258006aKickball Layout12-05-2014SD14-02 0258006bPlayground Games - Hopscoth, Alphabet Game and Number Game12-05-2014SD14-02 0258006cSkelly Game12-05-2014SD14-02 0258007aSoccer Field Layout - Synthetic Turf12-05-2014SD14-02 0258008aTennis Court Layout12-05-2014SD14-02 0258009aTrack Demarcation Lines for Lanes12-05-2014SD14-02 0258010aVolleyball Court Layout12-05-2014SD14-02 02721 - Trench Drains0272101aTrench Drain - Open Area11-01-2013SD13-04 0272101bTrench Drain - Along Curb or Wall11-01-2013SD13-04 02725 - Uderdrain System for Skinned Areas0272501aBaseball/Softball Clay/Skinned Area - Grass Section12-05-2014SD14-02 02831 - Chain Link Fences And Gates0252101aConcrete Curb and Fence Post Footing Details03-15-2021SD21-01 0283101aChainlink Fence - Elevation12-30-2022SD22-05 0283101bChainlink Fence with single gate - Elevation03-15-2021SD21-01 0283101cChainlink Fence with double Gate - Elevation03-15-2021SD21-01 0283101dChainlink Fence (15' High) with Double Gate - Elevation03-15-2021SD21-01 0283102aChainlink Gate Details (Slip Fit)03-15-2021SD21-01 0283102bChainlink Gate Details (Slip Fit)03-15-2021SD21-01 0283102cChainlink Gate Details (Slip Fit)03-15-2021SD21-01 0283103aChainlink Gate/Fence 15' Detail09-01-1996 0283103aChainlink Gate Details (Welded)03-15-2021SD21-01 0283103bChainlink Gate Details (Welded)03-15-2021SD21-01 0283103cChainlink Gate Details (Welded)03-15-2021SD21-01 0283104aChain-link Gate Locking Details03-15-2021SD21-01 0283106aBaseball Backstop Plan09-01-1996 0283106bBaseball Backstop Elevation09-01-1996 0283106cHooded Backstop Plan09-01-1996 0283106dHooded Backstop Details07-01-1996 0283106eHooded Backstop09-01-1996 0283106fHooded Backstop Fence Details09-01-1996 02862 - Outdoor Game Equipment0286201aBasketball Post And Backstop ( Free-Standing) Type 207-31-2017SD17-01 0286203aCombination Football/Soccer Goal Post Elevation09-01-1996 0286203bCombination Football/Soccer Goal Post Detail09-01-1996 0286204aTennis Court Net Post Sleeve Detail12-05-2014SD14-02 02870 - Site And Street Furnishings0287001aBench Detail07-31-2017SD17-01 287001Bench Detail09-01-1996 02900 - Landscaping0290001aTree Planting (Non-Paved Area)09-01-1996 0290001bTree Pit (In Paved Area)09-01-1996 290002Typical Planting Schedule09-01-1996 02 - Sitework Detail NumberDetail TitleIssue Or Last Revision DateLatest Bulletin No 03300 - Cast-in-Place Concrete0330000aInterior Pier and Footing - Detail12-30-2022SD22-05 0330001aExterior Pier and Footing - Detail12-30-2022SD22-05 0330002aPier Depression - Detail12-30-2022SD22-05 0330003aConcrete Wall Intersection - Details12-30-2022SD22-05 0330004aStepped Footing for Foundation Walls - Detail12-30-2022SD22-05 0330005aStepped Footing for Retaining Walls - Detail12-30-2022SD22-05 0330006aPier beneath Foundation Wall12-30-2022SD22-05 0330007aNosing For Exterior Concrete Steps12-30-2022SD22-05 0330007bExterior Concrete Steps on Grade Detail12-30-2022SD22-05 0330008aExpansion Joint for Concrete Retaining Wall12-30-2022SD22-05 0330009aChain Link Post Sleeve for Retaining Wall - Detail12-30-2022SD22-05 0330010aTypical Floor and Roof Construction (Metal Deck)12-30-2022SD22-05 0330010bTypical Floor and Roof Construction (Metal Deck)12-30-2022SD22-05 0330012aSlab Depression at Stair Landing12-30-2022SD22-05 0330013aConcrete Equipment Pad - Detail12-05-2014SD14-02 0330014aElevator Sill Depression - Detail12-30-2022SD22-05 0330015aAdditional Reinforcement at Concrete Wall Openings - Details12-30-2022SD22-05 0330016aConstruction Joint - Details12-30-2022SD22-05 0330017aCement Coat Waterproofing - Details12-05-2014SD14-02 0330018aSlab On Ground at Masonry Partition - Detail12-30-2022SD22-05 0330019aSlab On Ground at Depression - Detail12-30-2022SD22-05 0330020aConcrete Back-up Parapet Wall12-30-2022SD22-05 0330021aTypical Beam Pocket Detail12-30-2022SD22-05 0330022aConcrete Curb Details12-30-2022SD22-05 0330023aTypical Interior CMU Support On Metal Deck Details12-30-2022SD22-05 0330024aInterior Column on Footing W/O Pier Detail12-30-2022SD22-05 0330025aRoof Curb12-30-2011SD11-04 0330026aTypical Raised Slab Detail12-30-2022SD22-05 0330027aTypical Wall Sleeve Detail12-30-2022SD22-05 03450 - Architectural Precast Concrete Wall Panel0345001aPrecast Wall Panel General Notes12-30-2022SD22-05 0345002aPrecast Wall Panel at Inside Corner Column Detail12-30-2022SD22-05 0345003aPrecast Wall Panel at Outside Corner Column Detail12-30-2022SD22-05 0345004aPrecast Wall Panel at Column Plan Detail12-30-2022SD22-05 0345005aPrecast Wall Panel Two-Stage Joint Sealant Plan Detail12-30-2022SD22-05 0345005bPrecast Wall Panel Two-Stage Joint Sealant Section Detail12-30-2022SD22-05 0345005cPrecast Wall Panel Two-Stage Joint Sealant Isometric12-30-2022SD22-05 0345006aPrecast Wall Panel at Foundation without Cellar/Basement Detail12-30-2022SD22-05 0345007aPrecast Wall Panel at Foundation with Cellar/Basement Detail12-30-2022SD22-05 0345008aPrecast Wall Panel at Intermediate Floor Detail12-30-2022SD22-05 0345009aPrecast Wall Panel at Parapet Detail12-30-2022SD22-05 0345020aPrecast Wall Panel at Window Sill Detail12-30-2022SD22-05 0345021aPrecast Wall Panel at Window Jamb Detail12-30-2022SD22-05 0345022aPrecast Wall Panel at Window Head Detail12-30-2022SD22-05 03 - Concrete Detail NumberDetail TitleIssue Or Last Revision DateLatest Bulletin No 04200 - Unit Masonry0420001aChimney Stack / Masonry - Plan12-05-2014SD14-02 0420001bChimney Stack / Masonry - Section12-05-2014SD14-02 0420010aExterior Wall Section @ Foundation09-30-2020SD20-03 0420018aExterior Cavity Wall/ Loose Lintel and Bond-Beam Lintel12-05-2014SD14-02 0420019aExterior Cavity Wall with 4" Cavity - Detail12-05-2014SD14-02 0420020aExterior Cavity Wall / Masonry Column Enclosure11-01-2018SD18-05 0420020bExterior Cavity Wall / Masonry Column Enclosure at Exterior Corner11-01-2018SD18-05 0420020cExterior Cavity Wall / Masonry Column Enclosure at Inside Corner12-05-2014SD14-02 0420020dExterior Cavity Wall / Gypsum Board Column Enclosure11-01-2018SD18-05 0420020eExterior Cavity Wall / Gypsum Board Column Enclosure at Exterior Corner11-01-2018SD18-05 0420020fExterior Cavity Wall / Gypsum Board Column Enclosure at Inside Corner12-05-2014SD14-02 0420021aExterior Cavity Wall - Spandrel Beam and Hung Relieving Angle12-05-2014SD14-02 0420022aExterior Cavity Wall / Window M.O. - Spandrel Beam and Hung Relieving Angle12-05-2014SD14-02 0420022cExterior Cavity Wall - section @ Spandrel for Masonry Openings 8'-0" or less03-31-2016SD16-02 0420022eExterior Cavity Wall Spandrel with High Fixed Windows - Option w/ Stiffener Plate12-05-2014SD14-02 0420022gExterior Cavity Wall Spandrel with High Fixed Windows - Option w/ WT12-05-2014SD14-02 0420023aExterior Cavity Wall, Concrete Parapet - Details with Relieving Angle at Roof Slab12-05-2014SD14-02 0420023bExterior Cavity Wall, Concrete Parapet - Details without Relieving Angle at Roof Slab12-05-2014SD14-02 0420024aExterior Cavity Wall / Masonry - Concrete Roof Curb/Built-up Roof Detail12-05-2014SD14-02 0420024bExterior Cavity Wall - Concrete Roof Curb/Hot Fluid applied Membrane Detail12-05-2014SD14-02 0420025aSolid Brick Parapet with Steel Spandrel Beam12-29-2023SD23-04 0420025bRebar Installation at Steel Spandrel Beam with Concrete Topping12-29-2023SD23-04 0420025cRebar Installation in Load Bearing Masonry Wall12-29-2023SD23-04 0420026aSolid Brick Parapet with Concrete Spandrel Beam12-30-2011SD11-04 0420028aTop of CMU Wall Lateral Bracing Details12-05-2014SD14-02 0420029aTypical Exterior Wall Reinforcement Elevation12-23-2016SD16-05 0420040aTypical Interior CMU Wall Section and Bracing Details12-05-2014SD14-02 0420040ePartitions / Interior Masonry - Typical condition for Cove base12-05-2014SD14-02 0420040fInterior Control Joints at Fire Rated and Non Fire Rated Concrete Block Walls12-05-2014SD14-02 0420041aCMU Lintel Schedule and Details12-05-2014SD14-02 0420043aTypical Interior Wall Reinforcement Elevation12-05-2014SD14-02 0420050aDrinking Fountain Recess - Corridor / Two Single Bubblers12-30-2011SD11-04 0420052aFire Department Hose Valve and Cabinet12-05-2014SD14-02 0420060aParapet Wall Expansion Joint Details12-05-2014SD14-02 0420070aCast-In Place Concrete Chimney Cap12-30-2022SD22-05 0420081aBrick Veneer Metal Stud Wall at Foundation Detail08-30-2024SD24-02 0420081bBrick Veneer Metal Stud Wall at Slab-on-Grade Detail08-30-2024SD24-02 0420082aBrick Veneer Metal Stud Wall at Floor Slab & Window Head Opening w/ Window Guards/Barriers (Non-rated Ext. Wall) Detail08-30-2024SD24-02 0420082bBrick Veneer Metal Stud Wall at Floor Slab & Window Head Opening w/ Window Guards/Barriers (Fire-Rated Ext. Wall) Detail08-30-2024SD24-02 0420083aBrick Veneer Metal Stud Wall at Floor Slab & Windowsill Opening w/ Window Guards/Barriers Detail08-30-2024SD24-02 0420084aBrick Veneer Metal Stud Wall at Parapet and Roof Transition (Non-Rated Ext. Wall) Detail08-30-2024SD24-02 0420086aBrick Veneer Metal Stud Wall at Window Jamb w/ Window Guards &amp; Full Brick Return Plan Detail08-30-2024SD24-02 0420089aBrick Veneer Metal Stud Wall at Door Head Opening (Loose Lintel Detail08-30-2024SD24-02 0420089bBrick Veneer Metal Stud Wall at Door Head Opening (w/Shelf Angle System) Detail08-30-2024SD24-02 04435 - Cast Stone0443500aCast Stone Coping12-05-2014SD14-02 0443501aChimney Cap / Precast Concrete12-05-2014SD14-02 0443505aCoping Flashing at High - Low wall Juncture12-05-2014SD14-02 0443510aCorner Quoin stones Detail12-05-2014SD14-02 0443515aLedge Stone and Flashing12-05-2014SD14-02 04520 - Masonry Restoration0452000aBrick Stitching Patterns12-05-2014SD14-02 0452001aCorner Face Brick Replacement Without Control joint12-05-2014SD14-02 0452002aCorner Face Brick Replacement- With Control Joint12-05-2014SD14-02 0452003aControl Joint for Existing Exterior Masonry Wall12-05-2014SD14-02 0452010aFace Brick Replacement for Solid Masonry Construction12-05-2014SD14-02 0452011aFace Brick Replacement for Cavity Wall12-05-2014SD14-02 0452015aCorner Face Brick Replacement at Steel Column12-05-2014SD14-02 0452025aRepointing Mortar Joint Detail12-05-2014SD14-02 0452030aCorner Face Brick Replacement with Expansion Joint for Cavity Wall Detail12-05-2014SD14-02 0452100aSpall Repair Method for Terra-Cotta and/or Stone12-05-2014SD14-02 4521008Terra Cotta Spall Repair12-01-1996 04 - Masonry Detail NumberDetail TitleIssue Or Last Revision DateLatest Bulletin No 05120 - Structural Steel0512000aColumn Base Plate - Detail12-05-2014SD14-02 0512001aTypical col. Base Palte for Seismic/Wind Brace Columns Detail12-05-2014SD14-02 0512002aTypical Web Penetration Details 112-05-2014SD14-02 0512002bTypical Web Penetration Details 212-05-2014SD14-02 0512003aTypical Column Supported on Beam Details12-05-2014SD14-02 0512004aTypical Beam Supported Over Column Details12-05-2014SD14-02 0512005aTypical Stair Hanger Details12-05-2014SD14-02 0512006aTypical Folding Partition Support Detail12-05-2014SD14-02 0512007aTypical Masonry Wall on Steel Beam Details12-05-2014SD14-02 0512008aTypical Column Splice (Non-Tension Splice) Details12-05-2014SD14-02 0512009aTypical Rigid Moment Frame Connection Details12-05-2014SD14-02 0512009bTypical Moment Connection Details12-05-2014SD14-02 0512010aTypical Cantilevered Beam Connection Details12-05-2014SD14-02 0512011aTypical Brick Wall Support at Column Details12-05-2014SD14-02 0512012aMiscellaneous Relieving Angle Details12-05-2014SD14-02 0512100aWindow Lintel Replacement03-31-2016SD16-02 05300 - Metal Deck0530001aTypical Composite Slab Step Details12-05-2014SD14-02 0530002aCriteria For Electrical Conduit Placed In Metal Deck Slab12-05-2014SD14-02 0530003aTypical Metal Deck Opening Details 1 & 212-05-2014SD14-02 0530003bTypical Metal Deck Opening Details 3 & 412-05-2014SD14-02 0530004aTypical Metal Deck Support at Columns with Moment Connection Detail12-05-2014SD14-02 0530005aTypical Floor Construction @ Perimeter Column Detail12-05-2014SD14-02 0530010aTypical Construction Joint in Concrete over Metal Deck Detail12-05-2014SD14-02 05500 - Metal Fabrications0550001aWall Mounted Projector Housing Plan, Elevation and Section11-01-2013SD13-04 0550001bWall Mounted Projector Housing - Details11-01-2013SD13-04 0550007aT Saddle - Detail07-01-1994 0550011aAngle Base - Details07-01-1994 05700 - Ornamental Metal0570001aTrap Pit Door (Single) / Exterior - Detail07-01-1994 0570001bTrap Pit Door (Double) / Exterior - Detail07-01-1994 0570001cTrap Pit Door (Single) / Exterior - Detail07-01-1994 0570001dTrap Pit Door (Double) / Interior - Detail07-01-1994 0570001eTrap Pit Door (Single) / Interior With Floor Covering - Detail07-01-1994 0570001fTrap Pit Door (Double) / Interior With Floor Covering - Detail07-01-1994 0570001gTrap Pit Door (Single) / Interior With Ceramic Or Quarry Tile Floors - Detail07-01-1994 0570004aSubway Type Grating No Hinged Opening - Plan07-01-1994 0570004bSubway Type Grating with Hinged Opening - Plan07-01-1994 0570004cSubway Type Grating - Section and Details07-01-1994 0570005aIron Picket Fences and Gates - Elevations07-01-1994 0570005bIron Picket Fences And Gates - Details07-01-1994 0570005cIron Picket Fences And Gates - Details07-01-1994 0570005dIron Picket Fences And Gates - Details07-01-1994 0570005eIron Picket Fences And Gates - Details07-01-1994 0570005fIron Picket Fences And Gates - Details07-01-1994 0570005gIron Picket Fences And Gates / Moulded Top Rails - Details07-01-1994 0570005hIron Picket Fences And Gates / Cast Iron Shoes And Pipe Sleeves - Details07-01-1994 0570005iIron Picket Fences And Gates / Cast Iron Shoes And Pipe Sleeves - Details07-01-1994 0570005jIron Picket Fences And Gates / Cast Iron Brace - Details07-01-1994 0570005kIron Picket Fences And Gates / Pipe Sleeve Brace - Details07-01-1994 0570006aDance Barre and Post Detail01-02-2014SD14-01 0570010aChimney Clean-Out Doors - Details11-02-2009SD09-04 0570013aVent Back Grille - Details11-02-2009SD09-04 0570019aAluminum Hat And Coat Rack / Type "A" - Details07-01-1994 0570019bAluminum Hat And Coat Rack / Type "B" - Details07-01-1994 0570020aRoof Barrier Fence / Secured To Roof & Secured To Parapet - Elevations07-01-1994 0570020bRoof Barrier Fence / Secured To Roof - Plan And Detail07-01-1994 0570020cRoof Barrier Fence / Secured To Low Parapet - Elevation And Detail07-01-1994 0570020dRoof Barrier Fence / Top And Bottom Rail - Detail At End Panel At Wall07-01-1994 0570020eRoof Barrier Fence / Top And Bottom Rail - Detail At Intermediate Post07-01-1994 0570020fRoof Barrier Fence / Top And Bottom Rail - Detail At Corner07-01-1994 0570021aRoof Barrier Fence/ Secured to Roof (Galvanized Steel)11-01-1996 0570021bRoof Barrier Fence/ Secured to Roof and Parapet Elevations (Galvanized Steel)11-01-1996 0570021cRoof Barrier Fence/ Details (Galvanized Steel)11-01-1996 0570021eRoof Barrier Railing Secured to Parapet - Elevations (Galvanized)11-01-1996 0570024aType "A" Opening (T.A.O.) - Ceilings & Soffits07-01-1994 0570030aRoof ladder Details for Heights < 20 feet (Roof w/Parapet)11-29-2019SD19-05 0570030bRoof ladder Details for Heights < 20 feet (Roof w/ Fascia)11-29-2019SD19-05 0570031aRoof ladder Details for Heights ? 20 feet (Roof w/Parapet)11-01-2018SD18-05 0570031bRoof ladder Details for Heights ?20 feet (Roof w/Fascia)11-01-2018SD18-05 0570032aMetal Sliding Panel and Frame at Door Vision Panel04-30-2020SD20-02 0571000bStair Nosing Repair Detail07-01-2008SD08-02 0571000cSteel Stairs - Pre-cast Concrete Treads and Porcelain Pavers at Landing11-02-2009SD09-04 0571000dStair Details - Details at Pre-cast Treads01-31-2018SD18-01 0571000eStair Handrail Details03-29-2024SD24-01 05 - Metals Detail NumberDetail TitleIssue Or Last Revision DateLatest Bulletin No 06200 - Finish Carpentry0620006aAuditorium Stage / Platform Wood Steps07-31-2017SD17-01 0620006bAuditorium Stage / Platform Wood Steps - Sections07-31-2017SD17-01 0620006cAuditorium Stage / Platform Wood Steps - Details05-31-2007SD07-04 0620006dStage Pocket for Electrical and A/V @ Stage Wall - Detail09-29-2017SD17-02 06410 - Custom Casework0641001aTeacher's Wardrobe/ Elevations and Plans11-02-2009SD09-04 0641001bTeacher's Wardrobe/Details03-15-2002SD02-02 0641002aStudent's Wardrobe/ Elevations and Plans12-05-2014SD14-02 0641002bStudent's Wardrobe/ Details11-02-2009SD09-04 0641003aMaterial and Chart Cabinet - Elevation and Plans11-30-2021SD21-02 0641005aWall Hung Cabinet/Elevations and Plans and Details10-31-2016SD16-04 0641006aMoveable Book and Storage Cabinet - Plan, Elevation and Details06-15-2015SD15-02 0641006bWall Mounted Open Shelves -UC011 and Built In Counter/ Computer Table01-29-2016SD16-01 0641007aCountertop @ Sink/ Drinking Fountain03-13-2020SD20-01 0641007bCountertop @ Sink in K to 5th Grade Classrooms10-31-2023SD23-03 0641007cCountertop @ Sink in 3K to K Grade Classrooms10-31-2023SD23-03 0641008aLavatory Counter - Elevation, Section, &amp; Details09-29-2017SD17-02 0641009aTeacher's wardrobe/Storage Cabinet Details01-29-2016SD16-01 0641010aPre-Kindergarten Cubbies01-31-2018SD18-01 0641010bKindergarten Cubbies01-31-2018SD18-01 0641011aSecurity Desk Plan and Sections10-31-2023SD23-03 0641011bSecurity Desk Section Detail10-31-2023SD23-03 06 - Wood and Plastics Detail NumberDetail TitleIssue Or Last Revision DateLatest Bulletin No 07270 - Firestopping0727001aInterior Masonry Partition/Metal Deck Firestopping11-02-2009SD09-04 0727002aInterior Masonry Partition/Concrete Slab Firestopping11-02-2009SD09-04 0727003aInterior Steel Stud Partition/Concrete Slab Firestopping11-02-2009SD09-04 0727004aSteel Stud Partition/Metal Deck Firestopping11-02-2009SD09-04 07314 - Slate Shingles0731401aSlate Roof Ridge/Hip03-31-2016SD16-02 0731402aSlate Roof Ridge/Hip at Siding Intersection03-31-2016SD16-02 0731403aSlate Roof Ridge/Hip at Flat Roof Intersection03-31-2016SD16-02 0731404aSlate Roof Shingle Layout Plan03-31-2016SD16-02 0731405aSlate Roof Shingle Layout Section03-31-2016SD16-02 0731406aSlate Roof Eave Wood Cant03-31-2016SD16-02 0731407aSlate Roof Vertical Wall Flashing03-31-2016SD16-02 0731408aSlate Roof Valley Flashing03-31-2016SD16-02 07461 - UHPC Panel Rainscreen System0746102aUHPC Panel Rainscreen at Brick Transition02-28-2023SD23-01 0746103aUHPC Panel Rainscreen at Intermediate Slab02-28-2023SD23-01 0746104aUHPC Panel Rainscreen at Parapet02-28-2023SD23-01 0746121aUHPC Panel Rainscreen at Window Head02-28-2023SD23-01 0746122aUHPC Panel Rainscreen at Window Jamb02-28-2023SD23-01 0746123aUHPC Panel Rainscreen at Metal Windowsill02-28-2023SD23-01 07462 - Terra Cotta Panel Rainscreen System0746202aTerra Cotta Panel Rainscreen at Brick Transition02-28-2023SD23-01 0746203aTerra Cotta Panel Rainscreen at Intermediate Slab02-28-2023SD23-01 0746204aTerra Cotta Panel Rainscreen at Parapet02-28-2023SD23-01 0746221aTerra Cotta Panel Rainscreen at Window Head02-28-2023SD23-01 0746222aTerra Cotta Panel Rainscreen at Window Jamb02-28-2023SD23-01 0746223aTerra Cotta Panel Rainscreen at Metal Windowsill02-28-2023SD23-01 07553 - Hybrid Built-Up/SBS Modified Bituminous Roofing0755000aJunction of Existing and New PMRS Roofing03-31-2016SD16-02 0755301aBuilt-up Roofing with 2-Ply Vapor Barrier and Modified Cap Sheet on Concrete Deck04-29-2022SD22-01 0755301bBuilt-up Roofing with Vent base Sheet and Modified Cap Sheet on Concrete Deck04-29-2022SD22-01 0755302aBuilt-up Roofing with 2-Ply Vapor Barrier and Modified Cap Sheet on Concrete Deck (Uninsulated)04-29-2022SD22-01 0755302bBuilt-up Roofing with Vent Base Sheet and Modified Cap Sheet on Concrete Deck (Uninsulated)04-29-2022SD22-01 0755303aBuilt-up Roofing with 2-Ply Vapor Barrier and Modified Cap Sheet on Tectum or Nailable Concrete Deck04-29-2022SD22-01 0755303bBuilt-up Roofing with Vent Base Sheet and Modified Cap Sheet on Tectum or Nailable Concrete Deck04-29-2022SD22-01 0755304aBuilt-up Roofing with Modified Cap Sheet on Steel Roof Deck04-29-2022SD22-01 0755305aVent Base Sheet Fastening Pattern04-29-2022SD22-01 0755306aJunction of Existing and New Built-up Roofing (Insulated)04-29-2022SD22-01 0755307aJunction of Existing and New Built-up Roofing (Uninsulated)04-29-2022SD22-01 0755310aVentilator Curb Flashing04-29-2022SD22-01 0755311aFluid-Applied Resin Membrane Flashing at Built-up Roof04-29-2022SD22-01 0755312aFluid Applied Resin Membrane Penetration Flashing at Built-up Roof03-31-2016SD16-02 0755312bFluid Applied Membrane Penetration Flashing at Built-up Roof03-31-2016SD16-02 0755320aBuilt-up Roof with 2-Ply Vapor Barrier at Roof-to-Wall Expansion Joint04-29-2022SD22-01 0755320bBuilt-up Roof with Vent Base Sheet at Roof-to-Wall Expansion Joint04-29-2022SD22-01 0755321aBuilt-up Roof with 2-Ply Vapor Barrier at Roof-to-Roof Expansion Joint04-29-2022SD22-01 0755321bBuilt-up Roof with Vent Base Sheet at Roof-to-Roof Expansion Joint04-29-2022SD22-01 0755322aBuilt-up Roof with 2-Ply Vapor Barrier at Area Divider04-29-2022SD22-01 0755322bBuilt-up Roof with Vent Base Sheet at Area Divider04-29-2022SD22-01 0755323aRoof Expansion Joint Transition03-31-2016SD16-02 0755323bRoof Expansion Joint Transition03-31-2016SD16-02 0755323cRoof Expansion Joint Transition03-31-2016SD16-02 0755323dRoof Expansion Joint Transition03-31-2016SD16-02 0755323eRoof Expansion Joint Transition03-31-2016SD16-02 07554 - Cold Applied SBS-Modified Roofing System0755401aCold Applied SBS-Modified Roofing with Vapor Barrier on Concrete Deck10-31-2023SD23-03 0755401bCold Applied SBS-Modified Roofing with Vent Base Sheet on Concrete Deck10-31-2023SD23-03 0755402aCold Applied SBS-Modified Roofing with Vapor Barrier on Concrete Deck (Uninsulated)10-31-2023SD23-03 0755402bCold Applied SBS-Modified Roofing with Vent Base Sheet on Concrete Deck (Uninsulated)10-31-2023SD23-03 0755403aCold Applied SBS-Modified Roofing with Vapor Barrier on Tectum or Nailable Concrete Deck10-31-2023SD23-03 0755403bCold Applied SBS-Modified Roofing with Vent Base Sheet on Tectum or Nailable Concrete Deck10-31-2023SD23-03 0755404aCold Applied SBS-Modified Roofing with Vapor Barrier on Steel Roof Deck05-31-2023SD23-02 0755405aVent Base Sheet Fastening Pattern04-29-2022SD22-01 0755406aBuilt-up Roof Repair at Plaza Deck05-31-2023SD23-02 0755407aBuilt-up Roof Repair at Plaza Deck (Uninsulated)04-29-2022SD22-01 0755410aVentilator Curb Flashing04-29-2022SD22-01 0755411aFluid-Applied Membrane Flashing at Built-up Roof04-29-2022SD22-01 0755412aFluid-Applied Resin Membrane Penetration Flashing at Built-up Roof04-29-2022SD22-01 0755412bFluid-Applied Membrane Penetration Flashing at Built-up Roof04-29-2022SD22-01 0755413aPenetration Pocket on Built-up SBS Roof04-29-2022SD22-01 0755413bShell Shapes for Roof Penetration System04-29-2022SD22-01 0755420aCold-Applied SBS-Modified Roofing with Vapor Barrier at Roof-to-Wall Expansion Joint04-29-2022SD22-01 0755420bCold-Applied SBS-Modified Roofing with Vent Base Sheet at Roof-to-Wall Expansion Joint04-29-2022SD22-01 0755421aCold-Applied SBS-Modified Roofing with Vapor Barrier at Roof-to-Roof Expansion Joint04-29-2022SD22-01 0755421bCold-Applied SBS-Modified Roofing with Vent Base Sheet at Roof-to-Roof Expansion Joint04-29-2022SD22-01 0755422aCold-Applied SBS-Modified Roofing with Vapor Barrier at Area Divider04-29-2022SD22-01 0755422bCold-Applied SBS-Modified Roofing with Vent Base Sheet at Area Divider04-29-2022SD22-01 0755423aRoof Expansion Joint Transition04-29-2022SD22-01 0755423bRoof Expansion Joint Transition04-29-2022SD22-01 0755423cRoof Expansion Joint Transition04-29-2022SD22-01 0755423dRoof Expansion Joint Transition04-29-2022SD22-01 0755423eRoof Expansion Joint Transition04-29-2022SD22-01 07560 - Fluid-Applied Protected Membrane Roofing0756001aCurb detail at rooftop unit support07-01-2008SD08-02 0756001bDuct penetration detail07-01-2008SD08-02 0756001cPipe/Conduit penetration detail07-01-2008SD08-02 0756001dDunnage detail at roof top unit support07-01-2008SD08-02 07600 - Flashing and Sheet Metal0760001aRoof Edge Stop Fascia at Insulated Built-up Roof with Vapor Barrier01-29-2016SD16-01 0760001bRoof Edge Stop Fascia at Insulated Built-up Roof with Vent base Sheet01-29-2016SD16-01 0760002aEdge Stop Fascia at Non-insulated Built-up Roof with Vapor Barrier01-29-2016SD16-01 0760002bEdge Stop Fascia at Non-insulated Built-up Roof with Vent Base Sheet01-29-2016SD16-01 0760004aEdge Stop Fascia- Expansion Joint01-29-2016SD16-01 0760005aOverflow Scupper for Insulated Built-Up Roof with Vapor Barrier04-29-2022SD22-01 0760005bOverflow Scupper for Insulated Built-Up Roof with Vent Base Sheet04-29-2022SD22-01 0760006aOverflow Scupper for Non-insulated Built-Up Roof with 2-Ply Vapor Barrier01-29-2016SD16-01 0760006bOverflow Scupper for Non-insulated Built-Up Roof with Vent Base Sheet01-29-2016SD16-01 0760007aScupper for Insulated Built-Up Roof with Modified cap Sheet and 2-Ply Vapor Barrier01-29-2016SD16-01 0760007bScupper for Insulated Built-Up Roof with Modified cap Sheet and Vent Base Sheet01-29-2016SD16-01 0760008aScupper for Insulated Built-Up Roof with 2-Ply Vapor Barrier01-29-2016SD16-01 0760008bScupper for Insulated Built-Up Roof with Vent Base Sheet01-29-2016SD16-01 0760009aScupper for Non-insulated Built-Up Roof with Modified Cap Sheet and 2-Ply Vapor Barrier01-29-2016SD16-01 0760009bScupper for Non-insulated Built-Up Roof with Modified cap Sheet and Vent Base Sheet01-29-2016SD16-01 0760010aScupper for Non-insulated Built-Up Roof with 2-Ply Vapor Barrier01-29-2016SD16-01 0760010bScupper for Non-insulated Built-Up Roof with Vent Base Sheet01-29-2016SD16-01 0760011aGutter at Insulated Gravel Surfaced Roof with 2-Ply vapor Barrier01-29-2016SD16-01 0760011bGutter at Insulated Gravel Surfaced Roof with Vent Base Sheet01-29-2016SD16-01 0760012aGutter at Non-insulated Gravel Surfaced Roof with 2-Ply vapor Barrier01-29-2016SD16-01 0760012bGutter at Non-insulated Gravel Surfaced Roof with Vent Base Sheet01-29-2016SD16-01 0760013aGutter at Non-insulated Roof with Modified Cap Sheet and 2-Ply Vapor Barrier01-29-2016SD16-01 0760013bGutter at Non-insulated Roof with Modified Cap Sheet and Vent Base Sheet01-29-2016SD16-01 0760014aGutter at Non-insulated Roof with Modified Cap Sheet and 2-Ply Vapor Barrier01-29-2016SD16-01 0760014bGutter at Non-insulated Roof with Modified cap Sheet and Vent Base Sheet01-29-2016SD16-01 0760015aLeader Head, Leader and Splash Block01-29-2016SD16-01 0760020aCopper hung Gutter01-29-2016SD16-01 0760020bCopper built-in Gutter at Roof Eave01-29-2016SD16-01 0760021aCopper Lining Outlet Tube and Seam01-29-2016SD16-01 0760022aExpansion Joint in Gutter and End Cap01-29-2016SD16-01 0760022bRepair using Liquid Applied membrane01-29-2016SD16-01 0760030aMetal Coping for Solid Parapet Wall - Detail01-29-2016SD16-01 0760031aCoping Cover at Chimney wall01-29-2016SD16-01 0760032aCoping Flashing at Chimney Wall01-29-2016SD16-01 0760035aBulkhead Door Sill Pan Flashing01-29-2016SD16-01 0760036aBulkhead Door Saddle with 2-Ply Vapor Barrier01-29-2016SD16-01 0760036bBulkhead Door Saddle with Vent Base Sheet01-29-2016SD16-01 0760037aBulkhead Door Saddle @ Hot Fluid Applied Roof01-29-2016SD16-01 0760040aTwo Piece Built-In Cap Flashing02-28-2023SD23-01 0760041aReglet Cap Flashing01-29-2016SD16-01 0760042aSurface Mounted Cap Flashing at Concrete Wall01-29-2016SD16-01 0760043aCorner Cap Flashing01-29-2016SD16-01 0760044aCombination of Coping and Cap Flashing01-29-2016SD16-01 0760045aLow Flashing Termination Bar Detail01-29-2016SD16-01 0760050aSolid Masonry End Dam Flashing01-29-2016SD16-01 0760060aPipe Style Snow Guard Detail01-29-2016SD16-01 0760060bPipe Style Snow Guard Bracket Installation Detail01-29-2016SD16-01 0760061aSnow Guard Layout01-29-2016SD16-01 0761001aPlan and Elevation Showing Bulkhead Roof with Gutter at Standing Seam01-29-2016SD16-01 0761002aPlan and Elevation Showing Bulkhead Roof with Gutter at Flat Seam01-29-2016SD16-01 0761003aFascia at Flat Seam Copper Roof01-29-2016SD16-01 0761003bCopper Roof at Junction of Standing and Flat Seam (High Point)01-29-2016SD16-01 0761003cCopper Roof at Flat and Standing Seam (Low Point)01-29-2016SD16-01 0761003dCopper Roof at Flat Seam and Abutting Vertical Face01-29-2016SD16-01 0761003eStanding Seam Copper Roof and Fascia01-29-2016SD16-01 0761003fGutter with Downspout at Flat Seam Copper Roof01-29-2016SD16-01 0761003gGutter with Downspout at Standing Seam Copper Roof01-29-2016SD16-01 0761004aFlat Seam Copper Roof01-29-2016SD16-01 0761004bDevelopment of Flat Seam for Copper Roof01-29-2016SD16-01 0761005aDevelopment of Standing and Transverse Seam Detail for Copper Roof01-29-2016SD16-01 0761010aElevations of Bulkhead for Copper Siding01-29-2016SD16-01 0761011aCopper Siding with Fascia01-29-2016SD16-01 0761011bBase and Cap Flashing at Copper Siding01-29-2016SD16-01 0761015aCopper Coping Cover for Coping wider than 3' and Up01-29-2016SD16-01 07720 - Roof Accessories0772001aRoof Access Hatch for Hot Fluid-Applied Protected Membrane Roofing Detail06-15-2015SD15-02 0772001bRoof Acess Hatch For Built-Up Roof Detail06-15-2015SD15-02 0772002aRoof Smoke and Heat Vent For Fluid Applied Protected Membrane Roofing at Shafts Detail06-15-2015SD15-02 0772002bRoof Smoke And Heat Vent For Built-Up Roof at Shafts Detail06-15-2015SD15-02 07 - Thermal and Moisture Protection Detail NumberDetail TitleIssue Or Last Revision DateLatest Bulletin No 08000 - General0800000aTypical Door Types - Elevations01-31-2013SD13-01 0800000bTypical Door Types - Elevations and Notes11-29-2019SD19-05 08110 - Steel Doors, Frames, and Hollow Metal Work0811000aTypical Frame Types - Elevations04-17-2012SD12-01 0811000bTypical Frame Types - Elevations11-02-2009SD09-04 0811000cTypical Frame Types - Elevations11-29-2019SD19-05 0811001aHollow Metal. Door. / Exterior - Typical Construction03-29-2013SD13-02 0811001bHollow Metal Door / Exterior - Typical Construction06-15-2015SD15-02 0811002aHollow Metal Door / Interior Typical Construction03-29-2013SD13-02 0811002bHollow Metal Door / Interior Typical Construction03-29-2013SD13-02 0811003aHollow Metal Door Frame / Interior - Detail / Head & Jamb - Various Partition Types / Masonry11-02-2009SD09-04 0811003bHollow Metal Door Frame / Interior - Detail / Head & Jamb - Various Partition Types / Masonry11-02-2009SD09-04 0811003cHollow Metal Door Frame / Interior - Detail / Head & Jamb - Various Partition Types / Masonry11-02-2009SD09-04 0811003dHollow Metal Door Frame / Interior - Detail / Head & Jamb - Various Partition Types / Masonry11-02-2009SD09-04 0811003eHollow Metal Door Frame / Interior - Detail / Head & Jamb - Various Partition Types / Masonry11-02-2009SD09-04 0811003fHollow Metal Door Frame / Interior - Detail / Head & Jamb - Various Partition Types / Masonry11-02-2009SD09-04 0811003gHollow Metal Door Frame / Interior - Detail / Head & Jamb - Various Partition Types / Masonry11-02-2009SD09-04 0811003hHollow Metal Door Frame / Interior - Detail / Head & Jamb - Various Partition Types / Metal Stud03-13-2020SD20-01 0811003iHollow Metal Door Frame / Interior - Detail / Head & Jamb - Various Partition Types / Metal Stud03-13-2020SD20-01 0811003jHollow Metal Replace. Door Frame/ Exterior Detail- Head & Jamb/ Fixed Transom and Door06-15-2015SD15-02 0811003kHollow Metal Replace. Door Frame/ Exterior Detail- Head & Jamb/ Fixed Transom and Door06-15-2015SD15-02 0811004aHollow Metal Door Frame / Interior- Detail Of Typical Jamb, Anchor Bracket & Hardware Reinf.07-01-1994 0811004bHollow Metal Door Frame / Interior- Detail Of Jamb At Flush And Recessed Slabs07-01-1994 0811004cHollow Metal Door Frame / Interior- Detail For Fixed And Removable Mullions07-01-1994 08210 - Wood Doors0821001aWood Door / Interior (Non-Fire Rated) Typical (5-Ply) Construction11-02-2009SD09-04 08305 - Access Doors0830501aAccess Door For Ceilings / Soffits (Acoustic Tile / Gypsum Board)07-01-1994 0830502aAccess Door For Ceilings / Soffits (Gypsum Board)07-01-1994 08510 - Steel Windows - Projected, Casement, Pivoted, Double-Hung0851001a3/4 Hr. Fire Rated Steel Window Double Hung - Elevation11-02-2009SD09-04 0851001b3/4 Hr. Fire Rated Steel Window Double Hung - Head11-02-2009SD09-04 0851001c3/4 Hr. Fire Rated Steel Window Double Hung - Muntin and Meeting Rail11-02-2009SD09-04 0851001d3/4 Hr. Fire Rated Steel Window Double Hung - Sill11-02-2009SD09-04 0851001e3/4 Hr. Fire Rated Steel Window Double Hung - Jamb11-02-2009SD09-04 0851002a3/4 Hr. Fire Rated Steel Replacement Window Double Hung - Elevation11-01-1996 0851002b3/4 Hr. Fire Rated Steel Replacement Window Double Hung - Head11-01-1996 0851002c3/4 Hr. Fire Rated Steel Replacement Window Double Hung - Muntin And Meeting Rail11-01-1996 0851002d3/4 Hr. Fire Rated Steel Replacement Window Double Hung - Sill11-01-1996 0851002e3/4 Hr. Fire Rated Steel Replacement Window Double Hung - Jamb11-01-1996 0851002f3/4 Hr. Fire Rated Steel Replacement Window Double Hung - Mullion11-01-1996 08522 - Aluminum Double-Hung Windows - Replacement Installations0852200aAluminum Double Hung Windows - Elevations11-01-2013SD13-04 0852201aAluminum Double Hung Window - New Installation - Head detail @ operable sash11-01-2013SD13-04 0852201bAluminum Double Hung Window - New Installation - Sill detail11-01-2013SD13-04 0852201cAluminum Double Hung Window - New Installation - Jamb detail @ operable sash11-01-2013SD13-04 0852201dAluminum Double Hung Window - New Installation - Meeting Rail, Muntin details11-01-2013SD13-04 0852201eAluminum Double Hung Window - New Installation - Transom detail11-01-2013SD13-04 0852201fAluminum Double Hung Window - New Installation - Mullion detail @ operable sash11-01-2013SD13-04 0852201gAluminum Double Hung Window - New Installation - Head detail @ fixed sash11-01-2013SD13-04 0852201hAluminum Double Hung Window - New Installation - Jamb detail @ fixed sash11-01-2013SD13-04 0852201iAluminum Double Hung Window - New Installation - Mullion detail @ fixed sash11-01-2013SD13-04 0852202aAluminum Double Hung Window - Replacement (without existing frames) Installation - Head details11-01-2013SD13-04 0852202bAluminum Double Hung Window - Replacement(without existing frames) Installation - Sill detail11-01-2013SD13-04 0852202cAluminum Double Hung Window - Replacement(without existing frames) Installation - Jamb detail11-01-2013SD13-04 0852203aAluminum Replacement Window/Partial Wood Frame Replacement- Elev.07-18-1997 0852203bAluminum Replacement Window/Partial Wood Frame Replacement- Sill07-18-1997 0852203cAluminum Replacement Window/Partial Wood Frame Replacement- Jamb07-18-1997 0852203dAluminum Replacement Window/Partial Wood Frame Replacement- Mullion07-18-1997 0852203eAluminum Replacement Window/Partial Wood Frame Replacement- Iso. View07-18-1997 0852204aAluminum Double Hung Window - Replacement (over existing Frames) Installation - Head details11-01-2013SD13-04 0852204bAluminum Double Hung Window - Replacement (over existing Frames)Installation - Sill detail11-01-2013SD13-04 0852204cAluminum Double Hung Window - Replacement(over existing Frames) Installation - Jamb detail11-01-2013SD13-04 0852204dAluminum Double Hung Window - Replacement (over existing Frames) - Mullion details11-01-2013SD13-04 0852204eAluminum Double Hung Window - Replacement (over existing Frames) - Head detail @ fixed sash11-01-2013SD13-04 0852204fAluminum Double Hung Window - Replacement (over existing Frames) - Jamb detail @ fixed sash11-01-2013SD13-04 0852204gAluminum Double Hung Window - Replacement (over existing Frames) - Mullion detail @ fixed sash11-01-2013SD13-04 0852205aAluminum Replacement DH Window Elevations - Single and Double Bay Windows - SHPO Building11-01-2013SD13-04 0852205bAluminum Replacement DH Window-Head Detail - SHPO Building11-01-2013SD13-04 0852205cAluminum Replacement DH Window-Meeting Rail/Muntin Detail - SHPO Building11-01-2013SD13-04 0852205dAluminum Replacement DH Window - Sill Detail - SHPO Building11-01-2013SD13-04 0852205eAluminum Replacement DH Window - Jamb Detail - SHPO Building11-01-2013SD13-04 0852205fAluminum Replacement DH Window - Vertical Mullion Detail - SHPO Building11-01-2013SD13-04 08522 - Insect Screen0852206aInsect Screens at Aluminum DH Windows with Window Guards08-30-2006SD06-01 08524 - Aluminum Projected And Casement Windows0852401aAluminum Fixed/Projected Window New Construction - Elevation09-30-2020SD20-03 0852401bAluminum Fixed/Projected Window New Construction - Head Detail09-30-2020SD20-03 0852401cAluminum Fixed/Projected Window New Construction -Muntin and Horizontal Integral Mullion Details03-02-2007SD07-02 0852401cAluminum Fixed/Projected Window New Construction –Muntin and Horizontal Integral Mullion Details09-30-2020SD20-03 0852401dAluminum Fixed/Projected Window New Construction -Sill Detail09-30-2020SD20-03 0852401eAluminum Fixed/Projected Window New Construction -Jamb Detail @ Hopper Sash09-30-2020SD20-03 0852401fAluminum Fixed/Projected Window New Construction -Vertical Mullion - Hopper &amp; Fixed Sashes09-30-2020SD20-03 0852401gAluminum Fixed/Projected Window New Construction -Jamb Detail @ Fixed sash09-30-2020SD20-03 0852402aAluminum Fixed/Projected Window New - Insect Screen Details03-02-2007SD07-02 0852403aAluminum Fixed/Projected Window at Precast Wall Panel - Sill Detail04-29-2022SD22-01 0852403bAluminum Fixed/Projected Window at Precast Wall Panel - Jamb Detail04-29-2022SD22-01 0852403cAluminum Fixed/Projected Window at Precast Wall Panel - Head Detail04-29-2022SD22-01 08610 - Window Replacement0861001aWood Replacement Window Double-Hung Head Detail12-15-2000SD01-01 0861001bWood Replacement Window Double-Hung Meeting Rail12-15-2000SD01-01 0861001cWood Replacement Window Double-Hung Jamb Detail12-15-2000SD01-01 0861001dWood Replacement Window Double-Hung Muntin Detail12-15-2000SD01-01 0861001eWood Replacement Window Double-Hung Mullion Detail12-15-2000SD01-01 0861001fWood Replacement Window Double-Hung Split Mullion Detail12-15-2000SD01-01 0861001gWood Replacement Window Double-Hung Sill Detail12-15-2000SD01-01 0861001hWood Replacement Window Double-Hung Elevations12-15-2000SD01-01 08662 - Security Screens0866201aSecurity Screens - Key Elevation, Section And Hinge Detail07-01-1994 0866201bSecurity Screens - Detail At Lock And Latch Side Of Screen07-01-1994 0866202aSecurity Barrier - Key Elevation, Section And Hinge Detail07-01-1994 0866202bSecurity Barrier - Detail At Lock And Latch Side Of Screen07-01-1994 08 - Doors and Windows Detail NumberDetail TitleIssue Or Last Revision DateLatest Bulletin No 09100 - Non-Load Bearing Steel Studs0910001aNon-Load Bearing Steel Studs / Various Finishes - Details07-01-1994 0910001bNon-Load Bearing Steel Studs / Various Finishes - Details07-01-1994 0910001cGypsium Board Partition Control Joint05-29-2001SD01-05 09260 - Gypsum Board Assemblies0926001aAcoustic Tile/Gypsum Board Suspended Cceiling08-30-2006SD06-01 0926002aGypsum Board Suspended Cceiling08-30-2006SD06-01 0926003aGypsum Board Soffit With Gypsum Board/ Acoustic Tile Suspended Ceiling08-30-2006SD06-01 0926004aGypsum Board Soffit With Gypsum Board Suspended Ceiling08-30-2006SD06-01 0926005aGypsum Board Soffit With Acoustic Lay-in Tile Suspended Clg08-30-2006SD06-01 0926006aGypsum Board Soffit With No Suspended Ceiling08-30-2006SD06-01 0926007aGypsum Board Pocket With Acoustic Lay-in Tile Suspended Ceiling08-30-2006SD06-01 0926008aGypsum Board Pocket And Suspended Ceiling Gypsum Board/Acoustic Tile Ceiling08-30-2006SD06-01 0926009aGypsum Board Pocket And Suspended Ceiling -Gypsum Board Ceiling08-30-2006SD06-01 0926010aClassroom Acoustic Partitions - STC 5004-17-2012SD12-01 0926010bAcoustic Partition - STC 6004-17-2012SD12-01 09510 - Acoustical Ceilings0951001aAcoustic Lay-In Tile Suspended Cceiling08-30-2006SD06-01 0951001bAcoustic Lay-In Tile Suspended Ceiling / Axonometric View08-30-2006SD06-01 0951002aAluminum Metal Pan Suspended Ceiling07-01-1994 09590 - Wood Flooring0959001aGymnasium Wood Floor Above Occupied Space -Details07-31-2007SD07-05 0959001bAnchored Wood Floor - Details05-31-2007SD07-04 0959002aFloating Wood Floor @ Stage/Platform - Details05-31-2007SD07-04 0959003aFloating Wood Floor - Details05-31-2007SD07-04 09650 - Resilient Flooring0965002aMusic Room VCT Floor above Occupied Space - Details07-31-2007SD07-05 0965004aMetal & Resilient Edge Strips / Resilient Flooring - Details07-01-1994 09 - Finishes Detail NumberDetail TitleIssue Or Last Revision DateLatest Bulletin No 10100 - Visual Display Boards1010001aMarkerboard, Chalkboard & Tackboards -Elevations06-15-2015SD15-02 1010001bMarkerboard, Chalkboard and Tackboards Sections 1 and 201-31-2018SD18-01 1010001cMarkerboard, Chalkboard & Tackboards Sections 3 through 606-15-2015SD15-02 1010002aTack Surface Mounting Detail at Ceramic Tile Wainscot10-31-2023SD23-03 10151 - Toilet Compartments1015101aToilet Compartments / Plastic - Layout and Elevations06-15-2015SD15-02 1015101bToilet Compartments / Plastic - Details06-15-2015SD15-02 1015102aToilet Compartments / Metal - Layout and Elevations07-01-1994 1015102bToilet Compartments / Metal - Details07-01-1994 10160 - Factory-Painted Steel Toilet Partitions1016001aToilet Compartments / Painted Steel - Layout and Elevations07-01-1994 1016001bToilet Compartments / Painted Steel - Details07-01-1994 10214 - Stationary Metal Wall Louvers1021401aLouver / O.A.I. For U.V. - Exterior Cavity Wall - Plan View07-01-1994 1021401bLouver / O.A.I. For U.V. - Exterior Cavity Wall - Sect. "A" @ Slab07-01-1994 1021401cLouver / O.A.I. For U.V. - Exterior Cavity Wall - Sect. "A" Above Slab07-01-1994 1021401dLouver / O.A.I. For U.V. - Exterior Cavity Wall - Sect. "A" @ Roof Curb07-01-1994 1021401eLouver / O.A.I. For U.V. - Exterior Cavity Wall - Sect. "A" @ Roof Curb07-01-1994 1021401fLouver / O.A.I. For U.V. - Exterior Cavity Wall - Sect. "A" @ Slab Beneath Win.07-01-1994 1021401gLouver / O.A.I. For U.V. - Exterior Cavity Wall - Sect. "A" @ Roof Curb07-01-1994 1021402aLouver / Stationary Metal -Exterior Cavity Wall - Elev. and Jamb Det.07-01-1994 1021402bLouver / Stationary Metal -Exterior Cavity Wall - Head and Sill Det.07-01-1994 10350 - Flagpole1035001aFlag Pole / In-Ground07-01-1994 1035001bFlag Pole / In-Ground - Foundation Det.07-01-1994 10400 - Identifying Devices1040001aSchool Dedication Plaque - Elevation12-05-2014SD14-02 1040001bDedication Plaque - Edge Detail12-05-2014SD14-02 1040002aChildren's Aid Society Community School / Bronze Plaque - Elev. & Det.07-01-1994 1040003aNYC Green School Dedication Plaque03-29-2013SD13-02 1040004aNew York City Seal12-05-2014SD14-02 1040006aRoom Name And Number Plate - Elevation Types B1, C1. Typical Mounting Locations03-29-2019SD19-02 1040006aRoom Name and Number Sign - Type C1, Room Number Sign - Type B1, Typical Sign Mounting Locations08-30-2024SD24-02 1040006bRoom Identification Sign With Changeable Inserts - Types D1, D211-30-2022SD22-04 1040006cRoom Number, Name & Fire Rescue Area Sign - Type E1, Area of Rescue Assistance Sign - Type E2, Holding Area Sign - Type E308-30-2024SD24-02 1040006dAccessible Toilet Signs - Types F1, F211-30-2022SD22-04 1040006eAccessible Locker Room Signs - Types F3, F411-30-2022SD22-04 1040006fAccessible Staff Toilet Sign - Type F5, All Gender Toilet Signs - Types F6, F703-29-2024SD24-01 1040006gAll Gender Accessible Toilet Signs - Types F8, F9, Accessible Toilet Sign - Type F1003-29-2024SD24-01 1040008aFire Rescue Area Door Sign - Type G1, Area of Rescue Assistance Door Sign - Type G2, Ramp Accessibility Sign - Type H1, Accessibility Symbol - Type H208-30-2024SD24-02 1040008bHolding Area/Exterior Sign - Type J1, Holding Area/Door Sign - Type J2, F.D. Access/Window Guard Mounted Sign - Type K1, F.D. Access/Interior Window Mounted Sign - Type K208-30-2024SD24-02 1040008cLaboratory Signage - Type L1, Electrical Closet Signage - Type L212-05-2014SD14-02 1040008dStair Identification Sign - Type M1, Stair Accessible Floor Level Identification Sign - Type M2, Take the Stairs' Sign - Type M311-30-2022SD22-04 1040008eStair Floor Identification Sign - Type M4, Raised Character and Braille Exit Sign - Type M511-30-2022SD22-04 1040008fElevator Floor Identification Signs - Types N1, N1a, Elevator Car Identification Sign - Type N2, Elevator Emergency and Elevator Bank Identification Sign - Type N312-30-2022SD22-05 1040008gStar of Life Sign - Type N4, Miscellaeneous Elevator Signs - Types N5, N6, N7, N8, N908-30-2024SD24-02 1040008hDirectional Signage to Accessible Elements Sign - Type P1, Assistive Listening Systems Sign -Type Q1, International Symbol of Access for Hearing Loss Sign - Type Q2 Audio Induction Loop Sign - Type Q11-30-2022SD22-04 1040008iPlace of Assembly Occupancy Sign - Types R1, R2, Certificate of Occupancy Sign - Type R3, Certificate of Operation Sign - Type R412-30-2022SD22-05 1040008jFire Rescue Area Instruction Sign - Type U1, PA Space - Fire rescue Area - Area of Rescue Assistance to Stairs Door Sign - Type U211-30-2022SD22-04 1040008kRoof Gate Key Location Sign - Type DD; Roof Gate Key Sign - Type EE; FA UPS Equipment Sign -Type FF08-30-2024SD24-02 1040009aVideo Surveillance Sign - Type S112-05-2014SD14-02 1040009bBicycle Parking Disclaimer Sign - Type T112-05-2014SD14-02 1040009cGreen Vehicle Parking - Type T211-29-2019SD19-05 1040010aHigh-Rise Bldg. Stair Floor level and identification Sign - Type AA, High-Rise Bldg. Emergency Exit Sign - Type BB, High-Rise Bldg. 'No Exit' Sign - Type CC11-30-2022SD22-04 1040011aFlood Barrier Signage11-29-2019SD19-05 10415 - Bulletin Boards, Display Boards, Display Cabinets and Cases1041501aGlazed Display Board, 4'-0 Wide - Masonry Corridor Wall07-01-1994 1041501bGlazed Display Board, 6'-0 Wide - Masonry Corridor Wall07-01-1994 1041501cGlazed Display Board, 8'-0 Wide - Masonry Corridor Wall 1041501dGlazed Display Board - Masonry Corridor Wall Details07-01-1994 1041502aGlazed Display Cabinet, 4'-0 Wide - Masonry Corridor Wall07-01-1994 1041502bGlazed Display Cabinet, 6'-0 Wide - Masonry Corridor Wall07-01-1994 1041502cGlazed Display Cabinet, 8'-0 Wide - Masonry Corridor Wall07-01-1994 1041502dGlazed Display Cabinet - Masonry Corridor Wall Details07-01-1994 1041502eGlazed Display Cabinet - Masonry Corridor Wall Details07-01-1994 1041503aGlazed Display Cabinet, 8'-0" Wide - Gypsum Board Corridor Wall11-30-2021SD21-02 10505 - Metal Lockers1050501aMetal Lockers / Std. One and Two Tier Lockers - Elevations and Sections07-01-1994 1050501bMetal Lockers / Std. One and Two Tier Lockers - Sections and Details07-01-1994 1050501cMetal Lockers / Std. One and Two Tier Lockers - Details07-01-1994 10522 - Fire Extinguishers and cabinets1052201aFire Extinguisher Recess - Corridor11-02-2009SD09-04 1052201bFire Extinguisher Recess - Corridor11-02-2009SD09-04 10675 - Metal Storage Shelving1067501aMetal Shelving Types04-30-2020SD20-02 1067501bMetal Shelving Isometric Details and Notes11-30-2021SD21-02 10720 - Window Guards1072001aWire Mesh Guards For Windows / Exterior Windows 8'-1" or Greater - Elevations07-01-1994 1072001bWire Mesh Guards For Windows / Exterior Windows 8'-0" or Less - Elevations07-01-1994 1072001cWire Mesh Guards For Windows / Exterior Windows - Sect. and List Of Materials07-01-1994 1072001dWire Mesh Guards For Windows / Exterior Windows - Details03-31-2016SD16-02 1072002aWire Mesh Guards For Windows / Int. Windows 8'-1" or Greater - Elevations07-01-1994 1072002bWire Mesh Guards For Windows / Int. Windows 8'-0" or Less - Elevations07-01-1994 1072002cWire Mesh Guards for windows/Interior - Section and List of Materials03-02-2007SD07-02 1072002dWire Mesh Guards for windows/Interior - Details03-02-2007SD07-02 1072002eWire Mesh Guards For Windows / Int./Non-Hinged07-01-1994 1072002fWire Mesh Guards For Windows / Int./Non-Hinged07-01-1994 1072002gWire Mesh Guards For Windows / Int./Non-Hinged07-01-1994 1072002hWire Mesh Guards for Projected Windows /Interior/Windows 8'-1" High or Greater - Elevations03-02-2007SD07-02 1072002iWire Mesh Guards for Projected Windows /Interior/Windows 8'-0" High or Less - Elevations03-02-2007SD07-02 1072003aExpanded Metal Guards / Exterior Windows 8'-1" or Greater - Elevations07-01-1994 1072003bExpanded Metal Guards / Exterior Windows 8'-0" or Less - Elevations07-01-1994 1072003cExpanded Metal Guards / Exterior Windows - Sect. and List Of Materials07-01-1994 1072003dExpanded Metal Guards / Exterior Windows - Details03-31-2016SD16-02 1072004aExpanded Metal Guards for Windows / Exterior Elev. At Reduced Reveals11-15-1996 1072004bExpanded Metal Guards for Windows / Exterior Elev. At Reduced Reveals11-15-1996 1072004cExpanded Metal Guards for Windows / Exterior Details At Reduced Reveals11-15-1996 1072004dExpanded Metal Guards for Windows / Exterior Details At Reduced Reveals11-15-1996 10 - Specialties Detail NumberDetail TitleIssue Or Last Revision DateLatest Bulletin No 11172 - Waste Handling Equipment1117201aTypical Roll-on Roll-off Container Area Detail08-23-2001SD01-05 11400 - Kitchen Equipment1140001aWalk-In Refrigerator/Freezer02-28-2023SD23-01 1140002Walk-In Refrigerator/Freezer With Interior Ramp04-01-1997 1140003Walk-In Refrigerator With Interior Ramp04-01-1997 1140004Walk-In Refrigerator With Manufacturer's Floor04-01-1997 1140005aBack To Back Work Tables With Overshelf/Potrack (A)04-01-1997 1140005bBack To Back Work Tables With Overshelf/Potrack (B)05-14-2004SD04-02 1140006aBack To Back Work Tables With Overshelf/Potrack & Two Sink (A)04-01-1997 1140006bBack To Back Work Tables With Overshelf/Potrack & Sink (B)05-14-2004SD04-02 1140007aBack To Back Work Tables With Overshelf/Potrack - Table Mounted (A)05-14-2004SD04-02 1140007bBack To Back Work Tables With Overshelf/Potrack - Table05-14-2004SD04-02 1140008Floor Trough Grating04-01-1997 1140009Stainless Steel Floor Trough With Grating04-01-1997 1140010Mobile Slicer Table08-30-2006SD06-01 1140011Mobile Mixer Table08-30-2006SD06-01 1140012Back Counter04-01-1997 1140013aBack Counter With Utility Sink01-31-2013SD13-01 1140014Back Counter With Utility Sink & Hand Sink04-01-1997 1140015Trayslide With Roll Down Shutter04-01-1997 1140016Trayslide With Serving Counter04-01-1997 1140017Trayslide With Roll Down Shutter04-01-1997 1140018Preparation Sink - Two Compartment04-01-1997 1140019Preparation Sink - Two Compartment With Wall Shelf04-01-1997 1140020Potsink (3 Compartment Sink) With Overshelf08-30-2006SD06-01 1140021Potsink (3 Compartment Sink) With Wallshelf08-30-2006SD06-01 1140022Work Table With Wallshelf & Sink08-30-2006SD06-01 1140023Work Table With Overshelf & Sink08-30-2006SD06-01 1140024Work Table With Wallshelf04-01-1997 1140025Work Table With Overshelf04-01-1997 1140026Work Table With Overshelf/Potrack05-14-2004SD04-02 1140027Work Table With Backsplash04-01-1997 1140028aPreparation Sink - Two Compartment With Overshelf/Potrack (A)05-14-2004SD04-02 1140028bPreparation Sink - Two Compartment With Overshelf/Potrack (B)05-14-2004SD04-02 1140029aWork Table With Overshelf/Potrack (A)05-14-2004SD04-02 1140029bWork Table With Overshelf/Potrack (B)05-14-2004SD04-02 1140030aBack To Back Work Tables With Potrack (A)04-01-1997 1140030bBack To Back Work Tables With Potrack (B)05-14-2004SD04-02 1140031Cook's Table With Circular Potrack05-14-2004SD04-02 1140032Wallshelf04-01-1997 1140033Mixer Parts Rack04-01-1997 1140034Tool Drawer08-30-2006SD06-01 11400352" Rolled Down Edge For Stainless Steel Table Tops04-01-1997 1140036Housing For Convenience Outlet (Mounted On Tables)04-01-1997 1140037Sink & Table Leg04-01-1997 1140038Handicapped Work Table04-01-1997 1140039Work Table04-01-1997 1140040Sink Insert For Prep Table04-01-1997 1140042Gusset For Table Leg Mounting04-01-1997 1140043Stainless Steel "Z" Clip04-01-1997 1140044Corner Guard04-01-1997 1140045V Edge For Stainless Steel Table Tops04-01-1997 1140046Undershelf04-01-1997 1140047Gusset For Overshelf04-01-1997 1140048Shelf Bracket04-01-1997 1140049Sink Insert For Pot Sink Heater Compartment01-20-2005SD05-01 11480 - Gymnasium Equipment1148001aBasketball Backboard, Wall Mounted07-01-1994 1148002aBasketball Backboard, Ceiling Mounted - Fixed07-01-1994 1148003aBasketball Backboard, Ceiling Mounted - Backfold07-01-1994 1148004aBasketball Backboard, Ceiling Mounted - Forward Fold07-01-1994 11500 - Shop Equipment1150001aKiln Exhaust Hood / Plan Views07-01-1994 1150001bKiln Exhaust Hood - Front and Side Elevations07-01-1994 1150001cKiln Exhaust Hood - Sections "A" Thru "E"07-01-1994 1150001dKiln Exhaust Hood - Sections "F"07-01-1994 11600 - Laboratory Equipment1160001aScience Laboratories Furniture & Equipment Side Fascia/Aprons/Finish Panels-BC000/BC005, BC00111-23-2005SD05-03 1160001bScience Laboratories Furniture & Equipment 16", 18", 24", 31", 36", 54" W Countertop CTE 16, CTE 18, CTE 24, CTE 31, CTE 36, CTE 54 & Shelv.CTPR-1, CTPR-2, CTPR-311-23-2005SD05-03 1160001cScience Laboratories Furniture & Equipment Open Shelf Unit CW40110-31-2016SD16-04 1160002aScience Laboratories Furniture & Equipment Base Cabinets - BC011, BC079, BC083, BC08410-31-2016SD16-04 1160002bScience Laboratories Furniture & Equipment Base Cabinets-BC070, BC080, BC08111-23-2005SD05-03 1160002dScience laboratories Furniture& equipment Base cabinets � BC 08505-01-2018SD18-03 1160003aScience Laboratories Furniture & Equipment Base Cabinets-BC062, BC063, BC079A05-31-2007SD07-04 1160003bScience Laboratories Furniture & Equipment Base Cabinets-BC082, BC00305-31-2007SD07-04 1160004aScience Laboratories Furniture & Equipment Base Cabinets BC014, BC015, BC06505-31-2007SD07-04 1160004bScience Laboratories Furniture & Equipment Base Cabinets-BC066, BC06905-31-2007SD07-04 1160005aScience Laboratories Furniture & Equipment Base Cabinets-BC017, BC018, BC019, BC06103-13-2020SD20-01 1160005bScience Laboratories Furniture & Equipment Sink Base Cabinets-BC016, BC02011-23-2005SD05-03 1160005cScience Laboratories Furniture & Equipment Sink Base Cabinet-BC90111-23-2005SD05-03 1160006aScience Laboratories Furniture & Equipment Moveable student Tables LT001, LT001H, LT001A, LT001AH, LT001B, LT001BH11-23-2005SD05-03 1160006bScience Laboratories Furniture & Equipment Moveable student Table LT006311-23-2005SD05-03 1160007aScience Laboratories Furniture & Equipment student Work Table Biology- LT00507-01-2008SD08-02 1160007bScience Laboratories Furniture & Equipment student Work Table Biology- LT005H10-31-2016SD16-04 1160007cScience Laboratories Furniture & Equipment student Work Table Biology- LT00610-31-2016SD16-04 1160007dScience Laboratories Furniture & Equipment student Work Tables- LT007, LT007X, LT007B10-31-2016SD16-04 1160007eScience Laboratories Furniture & Equipment student Work Table- LT007H10-31-2016SD16-04 1160007fScience Laboratories Furniture & Equipment student Work Table- LT007HC10-31-2016SD16-04 1160007gScience Laboratories Furniture & Equipment student Work Table- LT00807-01-2008SD08-02 1160007hScience Laboratories Furniture & Equipment student Work Table- LT00907-01-2008SD08-02 1160007iScience Laboratories Furniture &amp; Equipment student Work Table- LT10005-01-2018SD18-03 1160007jScience Laboratories Furniture & Equipment student Work Table- LT100H10-31-2016SD16-04 1160007kScience Laboratories Furniture &amp; Equipment student Work Table- LT10105-01-2018SD18-03 1160007lScience Laboratories Furniture & Equipment student Work Table- LT10211-23-2005SD05-03 1160007mFurniture and Equipment -Service Island SE00105-01-2018SD18-03 1160008aScience Laboratories Furniture & Equipment Teacher's Demonstration Table LT00211-01-2013SD13-04 1160008bScience Laboratories Furniture & Equipment Teacher's Demonstration Table LT002A10-31-2016SD16-04 1160008cScience Laboratories Furniture & Equipment Teacher's Demonstration Table LT00310-31-2016SD16-04 1160008dScience Laboratories Furniture & Equipment Teacher's Demonstration Table LT003H10-31-2016SD16-04 1160008eScience Laboratories Furniture & Equipment Teacher's Demonstration Table LT00410-31-2016SD16-04 1160008fScience Laboratories Furniture & Equipment Teacher's Demonstration Table LT004A10-31-2016SD16-04 1160008gScience Laboratories Furniture & Equipment Teacher's Demonstration Table LT004B10-31-2016SD16-04 1160009aScience Laboratories Furniture & Equipment Ducted Fume Hoods- FH002, FH002H11-23-2005SD05-03 1160009bScience Laboratories Furniture & Equipment Ductless Portable Fume Hood-FH00408-30-2006SD06-01 1160009cScience Laboratories Furniture & Equipment Ducted Fume Hoods- FH005, FH005H11-23-2005SD05-03 1160009dScience Laboratories Furniture & Equipment Ducted Fume Hood Dual Entry- FH006H11-23-2005SD05-03 1160010aScience Laboratories Furniture & Equipment Microscope Storage Cabinets-SU012, SU013, SU01411-23-2005SD05-03 1160010bScience Laboratories Furniture & Equipment Microscope Storage Cabinets-SU018, SU022, SU02411-23-2005SD05-03 1160010cScience Laboratories Furniture & Equipment Microscope Storage Cabinets-SU023, SU036, SU32611-23-2005SD05-03 1160010dScience Laboratories Furniture & Equipment Microscope Storage Cabinets-SU328, SU32911-23-2005SD05-03 1160011aScience Laboratories Furniture & Equipment Wall Cabinets-CB601, CB602, CB60311-23-2005SD05-03 1160011bScience Laboratories Furniture & Equipment Upper Case Cabinet/Wall Hung-UC01911-23-2005SD05-03 1160013aScience Laboratories Furniture &amp; Equipment Epoxy Resin Sinks SK006, SK010, SK015, SK018, SK021and SK02205-01-2018SD18-03 1160013bScience Laboratories Furniture & Equipment Oval cup Sink SK01911-23-2005SD05-03 1160013cScience Laboratories Furniture & Equipment Trifacial Sink SK01612-30-2011SD11-04 1160014aScience Laboratories Furniture & Equipment Upright Rod Assembly- LMUR1(UR001)11-23-2005SD05-03 1160014bScience Laboratories Furniture & Equipment Glassware Drying Racks LMGR1, LMGR211-23-2005SD05-03 1160014cScience Laboratories Furniture & Equipment plant Study Center-LMPP1, Sterilizer-LMST111-23-2005SD05-03 1160014dScience Laboratories Furniture & Equipment Turret Base Cock for Gas, Air & Vacum-LMGC1, LMAC1, LMVC107-01-2008SD08-02 1160015aScience Laboratories Furniture & Equipment Water Faucet-SK00111-23-2005SD05-03 1160015bScience Laboratories Furniture & Equipment Water Faucet-SK001A11-23-2005SD05-03 1160015cScience Laboratories Furniture & Equipment Water Faucet/Muxing Valve-SK00211-23-2005SD05-03 1160015dScience Laboratories Furniture & Equipment Overhead Safety Shower & Eye Wash/Drench Hose-LMSF111-23-2005SD05-03 1160015eScience Laboratories Furniture & Equipment Eye Wash/Drench Hose-LMEW111-23-2005SD05-03 116002cScience Laboratories Furniture & Equipment Base Cabinets - BC0108, BC068, BC064, BC06705-31-2007SD07-04 11 - Equipment Detail NumberDetail TitleIssue Or Last Revision DateLatest Bulletin No 12485 - Foot Grilles1248501aFoot Grille11-01-2010SD10-02 12 - Furnishings Detail NumberDetail TitleIssue Or Last Revision DateLatest Bulletin No 13602 - Ballasted Photovoltaic Systems1360200aSustainable Roofing Zone Compliance Plan Schematic04-29-2022SD22-01 1360200bSustainable Roofing Zone Notes04-29-2022SD22-01 1360201aPV System Notes05-31-2023SD23-02 1360201bPV System Electrical Notes04-29-2022SD22-01 1360201cPV System Electrical Notes04-29-2022SD22-01 1360202aBallasted PV Racking System Details05-31-2023SD23-02 1360203aRoofing Section at PV System05-31-2023SD23-02 1360210aPV System Inverter Connections Single Line Diagram04-29-2022SD22-01 1360210bPV System Connections Single Line Diagram04-29-2022SD22-01 1360211aPV System Inverter Connections 3-Line Diagram04-29-2022SD22-01 1360211bPV System Connections 3-Line Diagram04-29-2022SD22-01 1360212aPV System Inverter Connections Elevation04-29-2022SD22-01 1360213aPV System Typical Grounding Detail04-29-2022SD22-01 1360214aPV Monitoring System Schematic04-29-2022SD22-01 1360215aPV Modules String Wiring Details04-29-2022SD22-01 1360216aPV Modules Wiring Installation Details04-29-2022SD22-01 1360217aPV System Flat Panel Display Wiring Diagram12-30-2022SD22-05 1360217aPV System Flat Panel Display Wiring Diagram04-29-2022SD22-01 13 - Special Construction Detail NumberDetail TitleIssue Or Last Revision DateLatest Bulletin No 15301 - Seismic Controls, Fire Protection Systems1530301aComponent Seismic Importance Factors - Fire Protection11-30-2022SD22-04 15330 - Sprinkler System1533000aSprinkler Notes11-30-2022SD22-04 15331 - Dry Standpipe System1533100aStandpipe Notes11-30-2022SD22-04 1533101aStandpipe Fire Department Connection Detail02-28-2023SD23-01 1533101bStandpipe Fire Department Connection Detail02-28-2023SD23-01 1533102aStandpipe Riser Diagram (One Riser and One Fire Department Connection)02-28-2023SD23-01 15332 - Combination Wet Standpipe/Sprinkler System1533200aCombination Wet Standpipe/Sprinkler Notes11-30-2022SD22-04 1533201aFire Hose valve cabinet10-03-2012SD12-02 1533202aPiping Arrangement - Combined Wet Standpipe/Sprinkler System02-28-2023SD23-01 1533203aFloor Control Valve Assembly - Combined Wet Standpipe/Sprinkler System02-28-2023SD23-01 1533204aExtension of Standpipe Riser or Roof Manifold above Roof02-28-2023SD23-01 1533205aFire Department Connection Behind Fencing10-31-2023SD23-03 1533206aStandpipe Riser Control Valve and Fire Hose Cabinet at Entrance Floor08-30-2024SD24-02 15333 - Fire Pumps/Sprinkler Booster Pumps1533301aFire or Sprinkler Booster Pump Water Flow Diagram11-30-2022SD22-04 1533301bAutomatic Fire Pump Detail for flow Testing11-30-2022SD22-04 15 - Fire Protection Systems Detail NumberDetail TitleIssue Or Last Revision DateLatest Bulletin No 15401 - General Provisions for Plumbing and Drainage Work1540100aBuilding Department Plumbing Notes11-30-2022SD22-04 1540101aPlumbing and Drainage Abbreviations01-29-2016SD16-01 1540102aPlumbing and Drainage Symbols - Part 1 of 201-29-2016SD16-01 1540102bPlumbing and Drainage Symbols - Part 2 of 201-29-2016SD16-01 1540103aPlumbing Fixture Schedule11-02-2009SD09-04 1540104aSchedule of Equipment for Domestic Hot Water11-02-2009SD09-04 1540105aPump Schedule11-02-2009SD09-04 15403 - Vibration Isolation and Seismic Controls, Plumbing and Drainage Systems1540301aComponent Seismic Importance Factors - Plumbing & Drainage11-30-2022SD22-04 15410 - Plumbing Piping1541000aPipe Penetration In Interior Wall / Floor / Ceiling11-02-2009SD09-04 1541001aPipe Penetration in Waterproof Slab11-02-2009SD09-04 1541002aPipe Penetration - Foundation Wall below Grade02-28-2023SD23-01 1541003aPipe Penetration - Exterior Wall above Grade02-28-2023SD23-01 1541004aGas Service Pipe Penetration - Foundation Wall below Grade02-28-2023SD23-01 1541005aGas Service Pipe Penetration - Slab On Grade02-28-2023SD23-01 15411 - Hangers and Supports1541100aAdjustable Clevis Pipe Support for Insulated Piping / Tubing larger than 102-28-2023SD23-01 1541101aAdjustable Swivel Pipe Support for Insulated Piping/Tubing 1 and Smaller02-28-2023SD23-01 1541102aSway Bracing (for No-Hub & Hub Horizontal Piping)02-28-2023SD23-01 1541103aNo Hub Pipe Bracing (For Vertical Piping)02-28-2023SD23-01 1541104aNo Hub Pipe Bracing (For Horizontal Piping 6 & Larger)02-28-2023SD23-01 1541105aNo-Hub & Hub Pipe Support (For Horizontal Piping)02-28-2023SD23-01 15415 - Drainage1541501aRoof Drain Detail Hot Fluid-Applied Protected Membrane Roofing Assembly10-31-2023SD23-03 1541501bControl Flow Roof Drain Detail Hot Fluid-Applied Protected Membrane Roofing Assembly.10-31-2023SD23-03 1541501cRoof Drain Detail Hot Fluid-Applied Protected Membrane Roofing Assembly - Roof top Play Area10-31-2023SD23-03 1541501eRoof Drain Detail Hot Fluid-Applied Protected Membrane Roofing Assembly. Roof W/ Ballasted PV system.10-31-2023SD23-03 1541502aStack Extension Detail Hot Fluid-Applied Protected Membrane Roofing Assembly09-30-2020SD20-03 1541511aRoof Drain Detail Cold Fluid-Applied resin Roofing Protected Membrane Roofing Assembly02-28-2023SD23-01 1541511bControl Flow Roof Drain Detail - Cold Fluid-Applied Resin Roofing Protected Membrane Roofing Assembly02-28-2023SD23-01 1541512aStack Extension Detail - Cold Fluid-Applied Resin Roof Protected Membrane Roofing Assembly.09-30-2020SD20-03 1541531aRoof Drain Detail - Cold Applied Built-up SBS/Modified Roof on Concrete Slab w/o Fill10-31-2023SD23-03 1541531bRoof Drain Detail - Cold Applied Built-up SBS/Modified Roof on Concrete Slab w/ Fill10-31-2023SD23-03 1541532aStack Extension Detail - Cold Applied Built-up SBS/Modified Roof on Concrete Slab w/ Fill02-28-2023SD23-01 1541541aRoof Drain Detail-Hybrid Built-Up SBS/Modified Bituminous Roof on Concrete Slab w/o Fill02-28-2023SD23-01 1541541bRoof Drain Detail - Hybrid Built-Up SBS/Modified Bituminous Roof on Concrete Slab with Fill02-28-2023SD23-01 1541541cRoof Drain Detail- Un-insulated Hybrid Built-Up SBS/Modified Bituminous Roof on Concrete Slab with Fill02-28-2023SD23-01 1541541dRoof Drain Detail- Hybrid Built-Up SBS/Modified Roof on Metal Deck02-28-2023SD23-01 1541542aStack Extension Detail - Hybrid Built-Up SBS Modified Roof on Concrete Slab w/Fill02-28-2023SD23-01 1541542bStack Extension Detail - Hybrid Built-Up SBS Modified Bituminious Roofing on Concrete Slab w/o Fill02-28-2023SD23-01 1541542cStack Extension Detail - Uninsuated Hybrid Built-Up SBS Modified Roof on Concrete Slab with Fill02-28-2023SD23-01 1541542dStack Extension Detail - Hybrid Built-Up SBS Modified Roof on Metal Deck02-28-2023SD23-01 1541551aJanitor's Sink Closet Piping - Type E Floor Drain09-30-2020SD20-03 1541552aDownspout Connection Detail02-28-2023SD23-01 1541553aGrease Interceptor Detail09-30-2020SD20-03 1541554aNeutralization of Acidic Condensate Waste Water from Condensing Boiler/Water Heater and Chimney02-28-2023SD23-01 1541555aFresh Air Inlet Detail02-28-2023SD23-01 15416 - Gas Piping System1541600aMaster Gas Control Valve Assembly - Wall Recess below Ceiling02-28-2023SD23-01 1541602aMaster Gas Control Valve Assembly - Exposed Below Ceiling02-28-2023SD23-01 1541603aMaster Gas Control Valve Assembly - Exposed On Wall02-28-2023SD23-01 1541604aHigh Pressure Gas Meter & Regulator Layout for Interruptible Gas (National Grid)02-28-2023SD23-01 1541604bHigh Pressure Gas Meter & Regulator Layout for Firm Gas in Combination for Interruptible Gas (National Grid)02-28-2023SD23-01 1541605aHigh Pressure Gas Meter & Regulator Layout for Firm Gas without Interruptible Gas (National Grid)02-28-2023SD23-01 1541606aLow Pressure Gas Meter & Booster Layout for Interruptible Gas. (National Grid)02-28-2023SD23-01 1541607aCathodic Protection System - Bonding of compression Couplings and Valves on Underground Steel gas Pipes02-28-2023SD23-01 1541607aCathodic Protection System - Test Stations02-28-2023SD23-01 1541607aCathodic Protection System - Thermit Weld Process for Attaching Wire to Pipe or Fitting02-28-2023SD23-01 15417 - Cold Water Supply1541700aDomestic Fire / Water Service02-28-2023SD23-01 1541701aWall Hydrant02-28-2023SD23-01 1541702a4 Water Service Header Schematic without a Booster Pump02-28-2023SD23-01 1541703a6 Fire Service Hyeader Detail02-28-2023SD23-01 1541704aWater Service/Fire Service Concrete Thrust Block Details02-28-2023SD23-01 1541705a4 Water Service Header Schematic with Booster Pump and Central RPZ Device02-28-2023SD23-01 1541707a4 Water Service Header Schematic with Booster Pump, DCV and Multiple Local RPZ Devices02-28-2023SD23-01 1541708aHeader Schematic for Domestic and Sprinkler Services Requiring a Sprinkler Booster Pump12-29-2023SD23-04 1541709aHeader Schematic for Domestic and Fire Services Requiring a Fire Pump12-29-2023SD23-04 15419 - Potable Water Filtration System1541900aPotable Water Filtration System Piping Schematic02-28-2023SD23-01 15432 - Miscellaneous1543200aRemovable Metal Casing - Detail02-28-2023SD23-01 15440 - Plumbing Fixtures1544000aBarrier Free Water Closet For Pre-K thru 6th Grade - Concealed Flushometer11-02-2009SD09-04 1544000bBarrier Free Water Closet For Pre-K thru 6th Grade - Exposed Flushometer11-02-2009SD09-04 1544007aJanitor's Sink Piping for Mop Service Sink02-28-2023SD23-01 1544008aScience Sink Waste Piping with Individual Neutralizing Tank02-28-2023SD23-01 1544008bIndividual Neutralizing tank - Science Sink Waste Piping02-28-2023SD23-01 1544009aScience Sink Waste Piping with Central pH Neutralization System02-28-2023SD23-01 1544010aSingle Bowl Self-Rimming Sink &amp; Drinking Fountain Plan for Pre-K thru 5th Grade02-28-2023SD23-01 15451 - Water Heaters1545100aWater Heater Piping Schematic02-28-2023SD23-01 1545101aHot Water Heater Flue Connection Detail02-28-2023SD23-01 15453 - Pumping Apparatus1545300aDuplex Heavy Duty Sump Pump02-28-2023SD23-01 1545301aSubmersible Sump Pump Detail - Top Inlet02-28-2023SD23-01 1545302aSubmersible Sump Pump Detail - Side Inlet02-28-2023SD23-01 1545303aElevator Sump Pump Detail02-28-2023SD23-01 1545303bHydraulic Elevator Sump Pump Detail02-28-2023SD23-01 1545304aSewage Ejector Details02-28-2023SD23-01 1545401aCentral Air-Source Heat Pump Water Heater Piping Schematic02-28-2023SD23-01 1545401aCentral Air-Source Heat Pump Water Heater Piping Schematic02-28-2023SD23-01 1545501aIntegrated Air-Source Heat Pump Water Heater Piping Schematic02-28-2023SD23-01 1545501aIntegrated Air-Source Heat Pump Water Heater Piping Schematic02-28-2023SD23-01 15454 - Central Air-Source Heat Pump Water Heaters1545402aCentral Air-Source Multi-pass Heat Pump Water Heater in Combination with Storage Tank(s) and Electric Water Heater08-30-2024SD24-02 15 - Plumbing and Drainage Detail NumberDetail TitleIssue Or Last Revision DateLatest Bulletin No 15501 - Basic Heating, Ventilation and Air Conditioning Requirements1550101aPiping Symbols01-05-2015SD15-01 1550101bHVAC Piping Symbols (Cont'd)01-05-2015SD15-01 1550101cDuct Symbols01-05-2015SD15-01 1550101dDuct Symbols (Cont'd)01-05-2015SD15-01 1550101eAbbreviations01-05-2015SD15-01 1550101fAbbreviations01-05-2015SD15-01 1550101gConvector Abbreviations01-05-2015SD15-01 1550101hCapital Improvement Projects (CIP) Control Symbols01-05-2015SD15-01 1550102aBoiler-Burner Unit Schedule12-30-2022SD22-05 1550103aFuel Oil Transfer Pump Schedule12-30-2022SD22-05 1550104aBoiler Feed Unit Schedule01-05-2015SD15-01 1550105aVacuum/Condensate Pump Schedule01-05-2015SD15-01 1550110aVariable Air Volume Box Schedule12-23-2016SD16-05 1550111aHeating, Ventilating, Air Conditioning Unit Schedule01-05-2015SD15-01 1550112aFan Schedule01-05-2015SD15-01 1550113aWater Pump Schedule12-23-2016SD16-05 1550114aWater-Cooled Water Chiller Schedule12-30-2022SD22-05 1550115aAir-Cooled Water Chiller Schedule12-30-2022SD22-05 1550116aCooling Tower Schedule12-30-2022SD22-05 1550117aUnit Ventilator Schedule01-05-2015SD15-01 1550118aAir-to-Air Heat Pump Schedule12-30-2022SD22-05 15503 - Vibration Isolation and Seismic Controls1550301aComponent Seismic Importance Factors - HVAC11-30-2022SD22-04 15510 - HVAC Piping1551001aLift-Type Vacuum Pump Suction Header Detail07-01-1994 1551001bGravity-Type Vacuum Pump Suction Header Detail07-01-1994 1551002aSteam and Return Runouts Detail07-01-1994 1551006aTypical Drip Connection Detail07-01-1994 1551008aSteam and Return Piping for Booster Heater Vacuum System Detail07-01-1994 1551011aSteam Drip with Test Connection Detail01-05-2015SD15-01 1551013aTypical Piping for Unit Heater Diagram07-01-1994 1551015aPipe Hanger Trapeze for Steel Beam Construction Detail (Piping with less than 120°F Temperature)12-29-2023SD23-04 1551017aPipe Hangers for Steel Beam Construction Detail (Piping with less than 120°F Temperature)12-29-2023SD23-04 1551018aPipe Hanger Trapeze for Steel Beam Construction Detail (Piping with Equal to or greater than 120°F Temperature)12-29-2023SD23-04 1551019aPipe Hangers for Steel Beam Construction Detail (Piping with Equal to or greater than 120°F Temperature)12-29-2023SD23-04 1551020aExterior Mounted Refrigerant Piping Support Construction Detail12-29-2023SD23-04 15517 - Water Treatment for the Glycol System1551701aWater Treatment Unit (Shot Feeder) Detail01-05-2015SD15-01 15555 - Fire-Tube Boilers (Steam)1555501aBoiler Feed Piping for Steam Boilers less than 100HP Diagram12-30-2022SD22-05 1555501bBoiler Blowoff Piping for Fire-Tube Firebox Boilers Diagram12-30-2022SD22-05 1555501cBoiler Feed Piping for Steam Boilers 100HP and Larger Diagram12-30-2022SD22-05 1555502aBoiler Piping for Fire-Tube, Firebox Boilers Diagram12-30-2022SD22-05 1555504aSteam Gauge and Pressuretrol Mounting Detail12-30-2022SD22-05 1555505aWater Leg Ring Detail01-05-2015SD15-01 15580 - Feedwater Equipment1558001aCondensate Receiver and Boiler Feed Pump Piping Diagram12-30-2022SD22-05 15594 - Fuel Burning and Handling Equipment1559401aFuel Oil Storage Tank Details12-30-2022SD22-05 15595 - Fuel Burning and Handling Equipment1559501a1Fuel Oil Pump-Mounted Duplex Heater with BMS Interface Piping and Control Diagram (1 of 2)04-29-2022SD22-01 1559501a2Fuel Oil Pump-Mounted Duplex Heater with BMS Interface Control Point List (2 of 2)04-29-2022SD22-01 1559502a1Fuel Oil Burner System Polisher with BMS Interface Piping and Control Diagram (1 of 2)11-30-2021SD21-02 1559502a2Fuel Oil Burner System Polisher with BMS Interface Control Point List (2 of 2)11-30-2021SD21-02 15891 - Metal Ductwork1589101aVertical Duct Penetration Clearances at Non-rated Floor &amp; Roof Openings Detail12-30-2022SD22-05 1589101bCombination Fire and Smoke Damper and Fire Damper Details12-30-2022SD22-05 1589106aTest Hole Fitting for Air Readings Detail07-01-1994 1589111aConnection of Exhaust Discharge Duct to Masonry Flue Detail07-01-1994 1589115aSupport for Overhead Indirect Heaters Detail01-05-2015SD15-01 15910 - Duct Accessories1591014aDuct Walk-Through Access Door Detail07-01-1994 15915 - Dampers1591502aFire Damper with Grille Detail12-30-2022SD22-05 15932 - Active Chilled Beams1593201aChilled Beam Installation Detail06-15-2015SD15-02 15970 - Temperature Control System (BACnet)1597001a24VAC Power Distribution Enclosure without Intermediate Telecommunication Closets Detail11-30-2021SD21-02 1597002aBACnet Floor-Mounted Data Cabinet Detail11-29-2024SD24-03 1597002bBACnet Wall-Mounted Data Cabinet Detail11-29-2024SD24-03 1597003aBACnet Wall-Mounted Data Enclosure with Single & Multiple MS/TP Routers Detail11-30-2021SD21-02 1597003bBACNET Wall-Mounted Data Enclosures with Single & Multiple RTRs and/or IP Switch(es) for BACnet IP Option Detail11-30-2021SD21-02 1597010aBACnet Control Network with Ethernet BACnet IP Switches for 15970 Projects Block Diagram11-29-2024SD24-03 1597010bBACnet Control Network with Ethernet BACnet IP Switches for 15971 Projects Block Diagram11-29-2024SD24-03 1597010cBACnet Control Network with Ethernet BACnet IP Switches for Small CIP Renovations Block Diagram12-30-2022SD22-05 1597010dBACnet Control W/VRF Network W/Manufacturer TSTAT Interface and Gateway for VRF System Projects Block Diagram08-30-2024SD24-02 1597011aBACnet Control Network with Ethernet BACnet IP and MS/TP Routers for 15970 Projects Block Diagram11-29-2024SD24-03 1597011bBACnet Control Network with Ethernet BACnet IP and MS/TP Routers for 15971 Projects Block Diagram11-29-2024SD24-03 1597012aHMI/SCADA BMS Network Navigation Diagram11-30-2021SD21-02 15975 - DDC Only1597501aDDC Symbols and Abbreviations07-26-2019SD19-04 1597502d24 VAC Power Distribution Enclosure without Intermediate Telecommunications Closet Detail07-26-2019SD19-04 1597503a1Variable Air Volume (VAV) Box Control Diagram (1 of 2)03-29-2024SD24-01 1597503a2Variable Air Volume (VAV) Box Control Point List (2 of 2)03-29-2024SD24-01 1597503b1Fan-Powered Variable Air Volume (FPVAV) Box Control Diagram (1 of 2)03-29-2024SD24-01 1597503b2Fan-Powered Variable Air Volume (FPVAV) Box Control Point List (2 of 2)03-29-2024SD24-01 1597503d1Four-Pipe Unit Ventilator Control Diagram (1 of 2)07-26-2019SD19-04 1597503d2Four-Pipe Unit Ventilator Control Point List (2 of 2)07-26-2019SD19-04 1597504a1Supplemental Electric Domestic Water Heater Control Diagram (1 of 2)07-26-2019SD19-04 1597504a2Supplemental Electric Domestic Water Heater Control Point List (2 of 2)07-26-2019SD19-04 1597504b1Gas-Fired Domestic Water Heater Control Diagram (1 of 2)07-26-2019SD19-04 1597504b2Gas-Fired Domestic Water Heater Control Point List (2 of 2)07-26-2019SD19-04 1597505a1Chiller Room Exhaust System Control Diagram ( 1 of 2)07-26-2019SD19-04 1597505a2Chiller Room Exhaust System Control Point List (2 of 2)07-26-2019SD19-04 1597506a1Steam/Hot Water Heat Exchanger Control Diagram (1 of 2)09-30-2020SD20-03 1597506a2Steam/Hot Water Heat Exchanger Control Point List (2 of 2)09-30-2020SD20-03 1597508a1Constant Volume (CV) Air Handling Unit (without Energy Wheel and Heat Wheel) Control Diagram (1 of 2)11-29-2024SD24-03 1597508a2Constant Volume (CV) Air Handling Unit (without Energy Wheel and Heat Wheel) Control Point List (2 of 2)11-29-2024SD24-03 1597508b1Variable Air Volume (VAV) Air Handling Unit (Coupled in Cooling with Terminal VAV Boxes for Non-Assembly Spaces) Control Diagram (1 of 2)11-29-2024SD24-03 1597508b2Variable Air Volume (VAV) Air Handling Unit (Coupled in Cooling with Terminal VAV Boxes for Non-Assembly Spaces) Control Point List (2 of 2)11-29-2024SD24-03 1597508c1CIP Comfort Controls H&V Unit Upgrade - Recirculating H&V Units Control Diagram (1 of 2)11-29-2024SD24-03 1597508c2CIP Comfort Controls H&V Unit Upgrade - Recirculating H&V Units Control Point List (2 of 2)11-29-2024SD24-03 1597508d1CIP Comfort Controls H&V Unit Upgrade - 100% Outside Air H&V Unit Control Diagram (1 of 2)11-29-2024SD24-03 1597508d2CIP Comfort Controls H&V Unit Upgrade - 100% Outside Air H&V Units Control Point List (2 of 2)11-29-2024SD24-03 1597508f1Constant Volume (CV) Air Handling Unit with Energy Wheel and Heat Wheel) Control Diagram (1 of 4)11-29-2024SD24-03 1597508f2Constant Volume (CV) Air Handling Unit with Energy Wheel and Heat Wheel) Control Point List (2 of 4)11-29-2024SD24-03 1597508f3Constant Volume (CV) Air Handling Unit with Energy Wheel and Heat Wheel) Control Point List (3 of 4)11-29-2024SD24-03 1597508f4Constant Volume (CV) Air Handling Unit with Energy Wheel and Heat Wheel) Control Point List (4 of 4)11-29-2024SD24-03 1597508g1Single Zone Variable Air Volume (SZVAV) Air Handling Unit for Kitchen & Cafeteria Control Diagram (1 of 4)11-29-2024SD24-03 1597508g2Single Zone Variable Air Volume (SZVAV) Air Handling Unit for Kitchen & Cafeteria Control Point List (2 of 4)11-29-2024SD24-03 1597508g3Single Zone Variable Air Volume (SZVAV) Air Handling Unit for Kitchen & Cafeteria Control Point List (3 of 4)11-29-2024SD24-03 1597508g4Single Zone Variable Air Volume (SZVAV) Air Handling Unit for Kitchen & Cafeteria Control Point List (4 of 4)11-29-2024SD24-03 1597508i1Single Zone Variable Air Volume (SZVAV) Air Handling Unit for Auditorium, Gymatorium and Gymnasium (with Energy Wheel) Control Diagram (1 of 4)11-29-2024SD24-03 1597508i2Single Zone Variable Air Volume (SZVAV) Air Handling Unit for Auditorium, Gymatorium and Gymnasium (with Energy Wheel) Control Point List (2 of 4)11-29-2024SD24-03 1597508i3Single Zone Variable Air Volume (SZVAV) Air Handling Unit for Auditorium, Gymatorium and Gymnasium (with Energy Wheel) Control Point List (3 of 4)11-29-2024SD24-03 1597508i4Single Zone Variable Air Volume (SZVAV) Air Handling Unit for Auditorium, Gymatorium and Gymnasium (with Energy Wheel) Control Point List (4 of 4)11-29-2024SD24-03 1597509a1CIP Steam Boiler Plant less than 100HP Control Diagram (1 of 2)10-31-2023SD23-03 1597509a2CIP Steam Boiler Plant less than 100HP Control Point List (2 of 2)10-31-2023SD23-03 1597509b1CIP Steam Boiler Plant 100HP and Larger Control Diagram (1 of 2)10-31-2023SD23-03 1597509b2CIP Steam Boiler Plant 100HP and Larger Control Point List (2 of 2)10-31-2023SD23-03 1597512b1Custom Roof Top Unit Constant Air Volume (CAV) Control Diagram (1 of 2)11-29-2024SD24-03 1597512b2Custom Roof Top Unit Constant Air Volume (CAV) Control Point List (2 of 2)11-29-2024SD24-03 1597512c1Custom Roof Top Unit Constant Volume (CV) for Kitchen & Cafeteria Control Diagram (1 of 2)11-29-2024SD24-03 1597512c2Custom Roof Top Unit Constant Volume (CV) for Kitchen & Cafeteria Control Point List (2 of 2)11-29-2024SD24-03 1597512e1Semi-Custom CAV Roof Top Unit Control Diagram (1 of 2)11-29-2024SD24-03 1597512e2Semi-Custom CAV Roof Top Unit Control Point List (2 of 2)11-29-2024SD24-03 1597512f1Custom Roof Top Unit Single Zone Variable Air Volume (SZVAV) for Gymnasiums, Auditoriums & Gymatoriums Control Diagram (1 of 2)11-29-2024SD24-03 1597512f2Custom Roof Top Unit Single Zone Variable Air Volume (SZVAV) for Gymnasiums, Auditoriums & Gymatoriums Control Point List (2 of 2)11-29-2024SD24-03 1597514a1Typical Retrofit Unit Ventilator with Direct Radiation Convectors Control Diagram (1 of 2)07-26-2019SD19-04 1597514a2Typical Retrofit Unit Ventilator with Direct Radiation Convectors Control Point List (2 of 2)07-26-2019SD19-04 1597516aUnit Heaters and Cabinet Unit Heaters Control Diagram12-30-2022SD22-05 15985 - Sequence of Operations1598501aBMS/DDC Symbols and Abbreviations11-30-2021SD21-02 1598503a1Variable Air Volume (VAV) Box Control Diagram (1 of 2)03-29-2024SD24-01 1598503a2Variable Air Volume (VAV) Box Control Point List (2 of 2)03-29-2024SD24-01 1598503b1Fan Powered Variable Air Volume (FPVAV) Box Control Diagram (1 of 2)03-29-2024SD24-01 1598503b2Fan Powered Variable Air Volume (FPVAV) Box Control Point List (2 of 2)03-29-2024SD24-01 1598503c1Decoupled Systems VAV Boxes and Unit Ventilators Control Diagrams (1 of 2)02-22-2019SD19-01 1598503c2Decoupled Systems VAV Boxes and Unit Ventilators Control Point List (2 of 2)02-22-2019SD19-01 1598503d1Decoupled System Four-Pipe Unit Ventilator Control Diagram (1 of 2)02-22-2019SD19-01 1598503d2Decoupled System Four-Pipe Unit Ventilator Control Point List (2 of 2)02-22-2019SD19-01 1598504a1Supplemental Booster Electric Domestic Hot Water Heater Control Diagram (1 of 2)04-30-2020SD20-02 1598504a2Supplemental Booster Electric Domestic Water Heater Control Point List (2 of 2)04-30-2020SD20-02 1598504b1Gas-Fired Domestic Water Heater Control Diagram (1 of 2)02-22-2019SD19-01 1598504b2Gas-Fired Domestic Water Heater Control Point List (2 of 2)02-22-2019SD19-01 1598504c1Central Heat Pump Domestic Water Heater Control Diagram (1 of 2)04-29-2022SD22-01 1598504c2Central Heat Pump Domestic Water Heater Control Point List (2 of 2)04-29-2022SD22-01 1598504d1Integrated Heat Pump Domestic Water Heater Control Diagram (1 of 2)04-29-2022SD22-01 1598504d2Integrated Heat Pump Domestic Water Heater Control Point List (2 of 2)04-29-2022SD22-01 1598505a1Chiller Room Exhaust System Control Diagram (1 of 2)12-30-2022SD22-05 1598505a2Chiller Room Exhaust System Control Point List (2 of 2)12-30-2022SD22-05 1598506a1Steam/Hot Water Heat Exchanger Control Diagram (1 of 2)02-22-2019SD19-01 1598506a2Steam/Hot Water Heat Exchanger Control Point List (2 of 2)02-22-2019SD19-01 1598508a1Constant Volume (CV) Air Handling Unit (Without Energy Wheel and Heat Wheel) Control Diagram (1 of 2)11-29-2024SD24-03 1598508a2Constant Volume (CV) Air Handling Unit (Without Energy Wheel and Heat Wheel) Control Point List (2 of 2)11-29-2024SD24-03 1598508b1Variable Air Volume (VAV) Air Handling Unit (Coupled in Cooling with Terminal VAV Boxes for Non-Assembly Spaces) Control Diagram (1 of 2)11-29-2024SD24-03 1598508b2Variable Air Volume (VAV) Air Handling Unit (Coupled in Cooling with Terminal VAV Boxes for Non-Assembly Spaces) Control Point List (2 of 2)11-29-2024SD24-03 1598508c1CIP Comfort Controls H&V Unit Upgrade - Recirculating H&V Units Control Diagram (1 of 2)11-29-2024SD24-03 1598508c2CIP Comfort Controls H&V Unit Upgrade - Recirculating H&V Units Control Point List (2 of 2)11-29-2024SD24-03 1598508d1CIP Comfort Controls H&V Unit Upgrade - 100% Outside Air H&V Units Control Diagram (1 of 2)11-29-2024SD24-03 1598508d2CIP Comfort Controls H&V Unit Upgrade - 100% Outside Air H&V Units Control Point List (2 of 2)11-29-2024SD24-03 1598508e1DOAS Constant Volume (CV) Air Handling Unit Control Diagram (1 of 4)11-29-2024SD24-03 1598508e2DOAS Constant Volume (CV) Air Handling Unit Control Point List (2 of 4)11-29-2024SD24-03 1598508e3DOAS Constant Volume (CV) Air Handling Unit Control Point List (3 of 4)11-29-2024SD24-03 1598508e4DOAS Constant Volume (CV) Air Handling Unit Control Point List (4 of 4)11-29-2024SD24-03 1598508f1Constant Volume (CV) Air Handling Unit (With Energy Wheel and Heat Wheel) Control Point List (1 of 4)11-29-2024SD24-03 1598508f2Constant Volume (CV) Air Handling Unit (With Energy Wheel and Heat Wheel) Control Point List (2 of 4)11-29-2024SD24-03 1598508f3Constant Volume (CV) Air Handling Unit (With Energy Wheel and Heat Wheel) Control Point List (3 of 4)11-29-2024SD24-03 1598508f4Constant Volume (CV) Air Handling Unit (With Energy Wheel and Heat Wheel) Control Point List (4 of 4)11-29-2024SD24-03 1598508g1Single Zone Variable Air Volume (SZVAV) Air Handling Unit for Kitchen & Cafeteria Control Diagram (1 of 4)11-29-2024SD24-03 1598508g2Single Zone Variable Air Volume (SZVAV) Air Handling Unit for Kitchen & Cafeteria Control Point List (2 of 4)11-29-2024SD24-03 1598508g3Single Zone Variable Air Volume (SZVAV) Air Handling Unit for Kitchen & Cafeteria Control Point List (3 of 4)11-29-2024SD24-03 1598508g4Single Zone Variable Air Volume (SZVAV) Air Handling Unit for Kitchen & Cafeteria Control Point List (4 of 4)11-29-2024SD24-03 1598508h1Decoupled Recirculating Constant Volume (CV) Air Handling Unit Control Diagram (1 of 4)11-29-2024SD24-03 1598508h2Decoupled Recirculating Constant Volume (CV) Air Handling Unit Control Point List (2 of 4)11-29-2024SD24-03 1598508h3Decoupled Recirculating Constant Volume (CV) Air Handling Unit Control Point List (3 of 4)11-29-2024SD24-03 1598508h4Decoupled Recirculating Constant Volume (CV) Air Handling Unit Control Point List (4 of 4)11-29-2024SD24-03 1598508i1Single Zone Variable Air Volume (SZVAV) Air Handling Unit for Auditorium, Gymatorium and Gymnasium (with Energy Wheel) Control Diagram (1 of 4)11-29-2024SD24-03 1598508i2Single Zone Variable Air Volume (SZVAV) Air Handling Unit for Auditorium, Gymatorium and Gymnasium (with Energy Wheel) Control Point List (2 of 4)11-29-2024SD24-03 1598508i3Single Zone Variable Air Volume (SZVAV) Air Handling Unit for Auditorium, Gymatorium and Gymnasium (with Energy Wheel) Control Point List (3 of 4)11-29-2024SD24-03 1598508i4Single Zone Variable Air Volume (SZVAV) Air Handling Unit for Auditorium, Gymatorium and Gymnasium (with Energy Wheel) Control Point List (4 of 4)11-29-2024SD24-03 1598508j1Variable Air Volume (VAV) AHU (Coupled in CLG W/ Terminal VAV boxes for Non-Assembly Spaces) W/ DT Coil Control Diagram (1 of 2)11-29-2024SD24-03 1598508j2Variable Air Volume (VAV) AHU (Coupled in CLG W/ Terminal VAV boxes for Non-Assembly Spaces) W/ DT Coil Control Point List (2 of 2)11-29-2024SD24-03 1598508l1Single Zone Variable Air Vol. (SZVAV) AHU for Aud., Gymatorium and Gymnasium W/ ERW and Dual Temp Coil Control Diagram (1 of 4)11-29-2024SD24-03 1598508l2Single Zone Variable Air Vol. (SZVAV) AHU for Aud., Gymatorium and Gymnasium W/ ERW and Dual Temp Coil Control Point List (2 of 4)11-29-2024SD24-03 1598508l3Single Zone Variable Air Vol. (SZVAV) AHU for Aud., Gymatorium and Gymnasium W/ ERW and Dual Temp Coil Control Point List (3 of 4)11-29-2024SD24-03 1598508l4Single Zone Variable Air Vol. (SZVAV) AHU for Aud., Gymatorium and Gymnasium W/ ERW and Dual Temp Coil Control Point List (4 of 4)11-29-2024SD24-03 1598508m1Single Zone Variable Air Volume (SZVAV) Air Handling Unit for Kitchen and Cafeteria W/ Dual Temp Coil Control Diagram (1 of 4)11-29-2024SD24-03 1598508m2Single Zone Variable Air Volume (SZVAV) Air Handling Unit for Kitchen and Cafeteria W/ Dual Temp Coil Control Point List (2 of 4)11-29-2024SD24-03 1598508m3Single Zone Variable Air Volume (SZVAV) Air Handling Unit for Kitchen and Cafeteria W/ Dual Temp Coil Control Point List (3 of 4)11-29-2024SD24-03 1598508m4Single Zone Variable Air Volume (SZVAV) Air Handling Unit for Kitchen and Cafeteria W/ Dual Temp Coil Control Point List (4 of 4)11-29-2024SD24-03 1598508n1Dedicated Outside Air Handling Unit (DOAS) W/ ERW and Heat Wheel with Dual Temp Coil Control Diagram (1 of 4)11-29-2024SD24-03 1598508n2Dedicated Outside Air Handling Unit (DOAS) W/ ERW and Heat Wheel with Dual Temp Coil Control Point List (2 of 4)11-29-2024SD24-03 1598508n3Dedicated Outside Air Handling Unit (DOAS) W/ ERW and Heat Wheel with Dual Temp Coil Control Point List (3 of 4)11-29-2024SD24-03 1598508n4Dedicated Outside Air Handling Unit (DOAS) W/ ERW and Heat Wheel with Dual Temp Coil Control Point List (4 of 4)11-29-2024SD24-03 1598509a1CIP Steam Boiler Plant less than 100HP Control Diagram (1 of 2)10-31-2023SD23-03 1598509a2CIP Steam Boiler Plant less than 100HP Control Point List (2 of 2)10-31-2023SD23-03 1598509b1CIP Hot Water Non-Condensing Boiler Plant Control Diagram (1of 2)02-22-2019SD19-01 1598509b2CIP Hot Water Non-Condensing Boiler Plant Control Point List (2 of 2)02-22-2019SD19-01 1598509c1Typical Single Loop Hot Water Condensing Boiler Plant Control Diagram (1 of 2)02-28-2023SD23-01 1598509c2Typical Single Loop Hot Water Condensing Boiler Plant Control Point List (2 of 2)02-28-2023SD23-01 1598509d1Typical Primary/Secondary Loop Hot Water Condensing Boiler Plant Control Diagram (1 of 3)02-28-2023SD23-01 1598509d2Typical Primary/Secondary Loop Hot Water Condensing Boiler Plant Control Point List (2 of 3)02-28-2023SD23-01 1598509d3Typical Primary/Secondary Loop Hot Water Condensing Boiler Plant Control Point List (3 of 3)02-28-2023SD23-01 1598509e1CIP Steam Boiler Plant 100HP and Larger Control Diagram (1 of 2)10-31-2023SD23-03 1598509e2CIP Steam Boiler Plant 100HP and Larger Control Point List (2 of 2)10-31-2023SD23-03 1598510a1Conventional Chilled Water Plant Monitoring (Primary Constant Speed Loop/Secondary Variable Speed Loop) Control Diagram (1 of 2)11-30-2021SD21-02 1598510a2Conventional Chilled Water Plant Monitoring (Primary Constant Speed Loop/Secondary Variable Speed Loop) Control Point List (2 of 2)11-30-2021SD21-02 1598510b1Chilled Water Plant Monitoring (Primary Variable Speed Loop/Secondary Variable Speed Loop) Control Diagram (1 of 2)11-30-2021SD21-02 1598510b2Chilled Water Plant Monitoring (Primary Variable Speed Loop/Secondary Variable Speed Loop) Control Point List (2 of 2)11-30-2021SD21-02 1598510c1Chilled Water Plant Monitoring (Primary Variable Speed Loop) with System Bypass Control Diagram (1 of 2)03-29-2024SD24-01 1598510c2Chilled Water Plant Monitoring (Primary Variable Speed Loop) with Bypass Valve Control Point List (2 of 2)03-29-2024SD24-01 1598510e1Central Heat Pump Chiller/Heater W/ FCU or VUV in Secondary Loop Control Diagram and Point List (1 of 2)03-29-2024SD24-01 1598510e2Central Heat Pump Chiller/Heater W/ FCU or VUV in Secondary Loop Control Diagram and Point List (2 of 2)03-29-2024SD24-01 1598511a1Typical Chilled Water Plant (Remote Air-Cooled Condenser) Control Diagram (1 of 2)11-30-2021SD21-02 1598511a2Typical Chilled Water Plant (Remote Air-Cooled Condenser) Control Point List (2 of 2)11-30-2021SD21-02 1598511b1Typical Chilled Water Plant (Water-Cooled Condenser) Control Diagram (1 of 2)11-30-2021SD21-02 1598511b2Typical Chilled Water Plant (Water-Cooled Condenser) Control Point List (2 of 2)11-30-2021SD21-02 1598512a1Custom Rooftop Unit (with Gas Furnace) Variable Air Volume (VAV) Control Diagram (1 of 2)11-29-2024SD24-03 1598512a2Custom Rooftop Unit (with Gas Furnace) Variable Air Volume (VAV) Control Point List (2 of 2)11-29-2024SD24-03 1598512b1Custom Rooftop Unit Constant Air Volume (CAV) Control Diagram (1 of 2)11-29-2024SD24-03 1598512b2Custom Rooftop Unit Constant Air Volume (CAV) Control Point List (2 of 2)11-29-2024SD24-03 1598512c1Custom Rooftop Unit Constant Volume (CV) for Kitchens &amp; Cafeterias Control Diagram (1 of 2)11-29-2024SD24-03 1598512c2Custom Rooftop Unit Constant Volume (CV) for Kitchens &amp; Cafeterias Control Point List (2 of 2)11-29-2024SD24-03 1598512d1Custom VAV Rooftop Unit 100% OA Decoupled Control Diagram (1 of 2)11-29-2024SD24-03 1598512d2Custom VAV Rooftop Unit 100% OA Decoupled Control Point List (2 of 2)11-29-2024SD24-03 1598512e1Semi-Custom CAV Rooftop Unit Control Diagram (1 of 2)11-29-2024SD24-03 1598512e2Semi-Custom CAV Rooftop Unit Control Point List (2 of 2)11-29-2024SD24-03 1598512f1Custom Rooftop Unit Single Zone Variable Air Volume (SZVAV) for Gymnasiums, Auditoriums & Gymatoriums Control Diagram (1 of 2)11-29-2024SD24-03 1598512f2Custom Rooftop Unit Single Zone Variable Air Volume (SZVAV) for Gymnasiums, Auditoriums & Gymatoriums Contol Point List (2 of 2)11-29-2024SD24-03 1598512g1Custom Rooftop Unit (with HW Coil) Variable Air Volume (VAV) Control Diagram (1 of 2)11-29-2024SD24-03 1598512g2Custom Rooftop Unit (with HW Coil) Variable Air Volume (VAV) Control Point List (2 of 2)11-29-2024SD24-03 1598512h1Custom Rooftop Heat Pump Multizone Variable Air Volume (MZVAV) Control Diagram (1 of 2)11-29-2024SD24-03 1598512h2Custom Rooftop Heat Pump Multizone Variable Air Volume (MZVAV) Control Point List (2 of 2)11-29-2024SD24-03 1598512i1Custom Rooftop Heat Pump Single Zone Variable Air Volume (SZVAV) for Gymnasiums, Auditoriums and Gymatoriums Control Diagram (1 of 2)11-29-2024SD24-03 1598512i2Custom Rooftop Heat Pump Single Zone Variable Air Volume (SZVAV) for Gymnasiums, Auditoriums and Gymatoriums Control Point List (2 of 2)11-29-2024SD24-03 1598512j1Custom Rooftop Heat Pump Dedicated Outdoor Air System (DOAS) Control Diagram (1 of 2)11-29-2024SD24-03 1598512j2Custom Rooftop Heat Pump Dedicated Outdoor Air System (DOAS) Control Point List (2 of 2)11-29-2024SD24-03 1598512k1Custom Rooftop Heat Pump Single Zone Variable Air Volume (SZVAV) for Kitchen/Cafeteria Control Diagram (1 of 2)11-29-2024SD24-03 1598512k2Custom Rooftop Heat Pump Single Zone Variable Air Volume (SZVAV) for Kitchen/Cafeteria Control Point List (2 of 2)11-29-2024SD24-03 1598512l1Commercial Rooftop Heat Pump Dedicated Outdoor Air System (DOAS) Control Diagram (1 of 2)11-29-2024SD24-03 1598512l2Commercial Rooftop Heat Pump Dedicated Outdoor Air System (DOAS) Control Point List (2 of 2)11-29-2024SD24-03 1598512m1Commercial Rooftop Heat Pump Multizone Variable Air Volume (MZVAV) Control Diagram (1 of 2)11-29-2024SD24-03 1598512m2Commercial Rooftop Heat Pump Multizone Variable Air Volume (MZVAV) Control Point List (2 of 2)11-29-2024SD24-03 1598512n1Commercial Rooftop Heat Pump Single Zone Variable Air Volume (SZVAV) Control Diagram (1 of 2)11-29-2024SD24-03 1598512n2Commercial Rooftop Heat Pump Single Zone Variable Air Volume (SZVAV) Point List (2 of 2)11-29-2024SD24-03 1598512o1Custom Rooftop Heat Pump Make-up Air Unit for Kitchens (MAUHTPMP) Control Diagram and Point List (1 of 2)11-29-2024SD24-03 1598512o2Custom Rooftop Heat Pump Make-up Air Unit for Kitchens (MAUHTPMP) Control Diagram and Point List (2 of 2)11-29-2024SD24-03 1598513a1Emergency Generator Day Tank/Main Tank Monitoring Control Diagram (1 of 2)04-30-2020SD20-02 1598513a2Emergency Generator Day Tank/Main Tank Monitoring Control Point List (2 of 2)04-30-2020SD20-02 1598514a1Typical Retrofit Unit Ventilator with Direct Radiation Convectors Control Diagram (1 of 2)02-22-2019SD19-01 1598514a2Typical Retrofit Unit Ventilator with Direct Radiation Convectors Control Point List (2 of 2)02-22-2019SD19-01 1598514b1Vertical Unit Ventilator Heat Pump W/ ERW Control Diagram (1 of 2)10-31-2023SD23-03 1598514b2Vertical Unit Ventilator Heat Pump W/ ERW Control Point List (2 of 2)10-31-2023SD23-03 1598514c1Vertical Unit Ventilator Dual Temperature W/ ERW Control Diagram (1 of 2)05-31-2023SD23-02 1598514c2Vertical Unit Ventilator Dual Temperature W/ ERW Control Point List (2 of 2)05-31-2023SD23-02 1598514d1Ceiling Mounted VRF Heat Pump w/ERV Control Diagram and Point List (1 of 2)08-30-2024SD24-02 1598514d2Ceiling Mounted VRF Heat Pump w/ERV Control Diagram and Point List (2 of 2)08-30-2024SD24-02 1598514e1Ceiling Mounted Fan Coil Unit w/ERV Control Diagram and Point List (1 of 2)08-30-2024SD24-02 1598514e2Ceiling Mounted Fan Coil Unit w/ERV Control Diagram and Point List (1 of 2)08-30-2024SD24-02 1598515a1Lighting and Receptacle Energy Monitoring &amp; Measuring Control Diagram (1 of 2)12-30-2022SD22-05 1598515a2Lighting and Receptacle Energy Monitoring &amp; Measuring Control Point List (2 of 2)12-30-2022SD22-05 1598515b1Misc. Energy Monitoring &amp; Measuring Control Diagram (1 of 2)12-30-2022SD22-05 1598515b2Misc. Energy Monitoring &amp; Measuring Control Point List (2 of 2)12-30-2022SD22-05 1598515c1Misc. Pump and Fan Monitoring & Measuring Control Diagram (1 of 2)09-30-2020SD20-03 1598515c2Misc. Pump and Fan Monitoring & Measuring Control Point List (2 of 2)09-30-2020SD20-03 1598516aUnit Heaters and Cabinet Unit Heaters Control Diagram and Control Point List12-30-2022SD22-05 1598516bFinned Tube Radiators, Baseboards and Convectors Control Diagram and Control Point List03-29-2024SD24-01 1598517aChilled Beams Associated with Hot Water Heating Units Control Diagram and Control Point List02-22-2019SD19-01 1598518aDisplacement Induction Units Control Diagram and Control Point List02-22-2019SD19-01 15 - Heating Ventilating and Air Conditioning Detail NumberDetail TitleIssue Or Last Revision DateLatest Bulletin No 16010 - Supplementary General Requirements1601000aAbbreviations07-01-1994 1601001aGeneral Notes07-01-1994 1601001bGeneral Notes02-28-2023SD23-01 1601002aLighting & Power Symbols11-02-2009SD09-04 1601003aPublic Address & Clock System Symbols11-23-2005SD05-03 1601004aInternet Protocol Digital Video Surveillance System Symbols07-01-2008SD08-02 1601005aTelecommunication System Symbols11-23-2005SD05-03 1601006aDimming and Projection Symbols11-23-2005SD05-03 1601007aIntrusion Alarm System Symbols11-02-2009SD09-04 1601008aFire Detection & Alarm System Symbols11-23-2005SD05-03 1601009aAuxilliary Signal System Symbols11-23-2005SD05-03 1601010aRemoval Symbols07-01-1994 16110 - Raceways1611000aCable Tray / Corridor - Sectional View09-03-1996 1611001aConduit Penetration thru Fire Rated Wall07-01-1994 1611002aConduit Penetration thru Foundation Wall07-01-1994 1611003aConduit Penetration thru Waterproof Slab07-01-1994 16130 - Raceways, Fittings, Supporting Devices, Boxes and Accessories1613000aTypical Low Voltage Systems Wiring for New Construction03-02-2007SD07-02 16140 - Wiring Devices1614000aReceptacle Wiring07-01-1994 1614001aComputer Labs - Access Floor Workstation Module07-01-1994 1614002aDual Channel Raceways Wiring Diagram11-01-2008SD08-03 1614003aLibrary Security System Raceway Detail11-01-2008SD08-03 16450 - Service Grounding & Bonding1645000aGrounding - Water Pipe Ground Connections & Ground Bus07-01-1994 1645000bGrounding - Ground Bus Bar Schedule07-01-1994 1645001aGrounding - System with Ground Bus & Neutral Bus07-01-1994 1645002aGrounding - Raceway Equipment Grounding System07-01-1994 1645003aIsolated Ground Conductor System07-01-1994 16480 - Motors & Control Equipment1648000aKitchen Hood Exhaust Motor Starter and Interlocking Wiring Diagram05-01-2018SD18-03 1648001aMaster Gas Control Valve Schematic Wiring Diagram (AC)07-01-1994 1648002aMaster Gas Control Valve Schematic Wiring Diagram (DC)07-01-1994 16500 - Interior & Exterior Lighting1650000aLighting - Support For Pendant Mounted Lighting Fixture07-01-1994 1650000bLighting - Support For Pendant Mounted Lighting Fixture (Enlarged View)07-01-1994 1650001aLighting - Auditorium Lighting Dimming Program07-01-1994 16503 - Vibration Isolation and Seismic Controls, Electrical Systems1650301aComponent Seismic Importance Factors Plumbing & Drainage11-30-2022SD22-04 16520 - Exit Sign Lighting and Emergency Lighting Fixtures and Systems1652000aEmergency Lighting Wiring Diagram (With Battery Units)09-03-1996 1652001aEmergency Lighting Wiring Diagram (Without Battery Units)07-01-1994 16530 - Site/Security Lighting1653000aExterior Security Lighting Control Wiring Diagram03-02-2007SD07-02 16532 - Sports Lighting Equipment1653200aExterior Lighting - Light Pole & Waterproof Grounding Box07-01-1994 1653201aPlayground - Service Equipment / Elevation07-01-1994 1653201bPlayground - Service Equipment / Plan & One Line Service Diagram07-01-1994 16670 - Lightning Protection1667000aBoiler Chimney Grounding and Lighting Protection System02-28-2023SD23-01 16720 - Fire Detection & Alarm System1672000aFire Alarm System Riser Notes02-28-2023SD23-01 1672000bFire Alarm System Power Diagram02-28-2023SD23-01 1672001aSequence of Operation for Master Coded Fire Alarm System with Individually Addressable Devices07-31-2007SD07-05 1672002aFire Vent Wiring Diagram07-01-1994 16725 - Telephone & Intercom Cabling System1672500aSemi-Flush Mounted Telephone Lock Box11-30-2007SD07-06 16727 - Data Cabling System1672700aVoice and Data Cable Tags and Termination labels03-02-2007SD07-02 16770 - Sound, Intercom and Teacher Activated Security System1677000aSound System - Local Sound System Base Diagram07-01-1994 16771 - Projection System1677100bAuditorium Projection System Wiring Diagram02-28-2023SD23-01 1677100cInteractive White Board Details03-29-2013SD13-02 1677101aAdjustable Height Interactive Whiteboard08-30-2024SD24-02 1677101bFixed Height Interactive White Board Detail08-30-2024SD24-02 1677101cFixed Height Interactive Whiteboard (3K &amp; UPK)08-30-2024SD24-02 1677102aFlat Screen Display for School information Wiring Diagram02-28-2023SD23-01 16785, 16786 - Digital IPDVS Camera Mounting Details1678600aIPDVS Symbol List02-28-2023SD23-01 1678601aIPDVS Camera Wiring Diagrams02-28-2023SD23-01 1678602aIndoor Wall-mounted Camera in Gypsum Board Wall02-28-2023SD23-01 1678602bIndoor Recessed-mounted Camera in Gypsum Board Suspended Ceiling02-28-2023SD23-01 1678602cIndoor Recessed-mounted Camera in Lay-in Suspended Ceiling02-28-2023SD23-01 1678602dIndoor Surface-mounted Camera02-28-2023SD23-01 1678603aIndoor 90-degree Corner-mounted Camera in Lay-in Suspended Ceiling02-28-2023SD23-01 1678603bIndoor 90-degree Corner-mounted Camera in Existing Building02-28-2023SD23-01 1678604aPendant-mounted Camera with Extended Arm02-28-2023SD23-01 1678605aIndoor Fixed-view and Short-throw Camera in Concrete Block02-28-2023SD23-01 1678605bIndoor and Outdoor Installation for Short-throw Camera in Existing Building (CIP)02-28-2023SD23-01 1678606aExterior Parapet-mounted Camera02-28-2023SD23-01 1678606bExterior Wall-mounted Camera in Precast Concrete Panel02-28-2023SD23-01 1678606cExterior Wall-mounted Camera in Existing Building (CIP)02-28-2023SD23-01 1678606dExterior Corner-mounted Camera02-28-2023SD23-01 1678607aInternet Protocol Digital Video Surveillance System (IPDVS) Cabinet Details02-28-2023SD23-01 1678607bInternet Protocol Digital Video Surveillance System (IPDVS) and Data Full Cabinet Details02-28-2023SD23-01 1678607cIDF/MDF Room Half Cabinet Details02-28-2023SD23-01 169001690000aGas Service - SC12 Dual Fuel Interruptible Gas Service Diagram12-18-1996 1690000bGas Service SC12 Dual Fuel Interruptible Gas Service Diagram12-18-1996 1690001aGas Service - Gas Booster Control Panel Wiring Diagram07-01-1994 1690101aGas Meter Room / Electrical Requirements09-03-1996 16 - Electrical Room Planning Standards The Room Planning Standards provide the design basis for all spaces in New York City Public Schools, including all intended equipment and general locations of furnishings. They clearly delineate those items to be provided by the contractor and those by the Authority. They require modification based on actual (as designed) room layout and size, and for existing rooms may end up being modified due to space and program constraints.The following table lists changes the designer is to make to the indicated Room Planning Standards that have not been incorporated as of yet into the Drawings. Many times changes are made to one series of drawings that may also apply to others. Our intent is not to issue new RPS until all known modifications are incorporated. Until the new RPS is complete, please use the matrix below to modify project drawings (based on the current RPS). Matrix of Changes to Existing RPSThe following link lists changes the designer is to make to the indicated Room Planning Standards that have not been incorporated as of yet into the Drawings. Many times changes are made to one series of drawings that may also apply to others. Our intent is not to issue new RPS until all known modifications are incorporated. Until the RPS is revised, please use the matrix to modify the published RPS for use on the project.Matrix of Changes to Existing RPSMatrix of New Spaces, including FinishesThe following link lists new spaces that may be included in a POR for which a room layout has not been issued. These new spaces are typically a combination of published RPS layouts or a reduced floor area. Also included in the matrix are the intended finishes and furniture to be used for the space.Matrix of New Spaces, including Finishes –Room Size per PORIn order to view the Room Planning Standards, you must have a working version of Adobe Acrobat Reader installed. You may download the latest viewer for free by following this link: Adobe Acrobat Reader.To download AutoCAD *.dwg files, please go to the Downloads page and under the Room Planning Standards section, you can download and extract each Group in it's entirety.Complete List of Room Planning Standard Layout NumberLayout NameIssue Or Last Revision DateLatest Bulletin No00 - General00-00Room layouts-Forward03-20-2008RPS08-0100-01Table Of Contents07-31-2021RPS21-0100-02Table Of Contents08-16-2021RPS21-0200-03Legend07-31-2021RPS21-0100-04Concept Height Diagram04-30-2025RPS25-0200-05Comparison Table-Old/New Layout Numbers PS/IS11-23-2005RPS05-0100-06Comparison Table-Old/New Layout Numbers HS11-23-2005RPS05-0100-07Index-Master Items List11-23-2005RPS05-0100-08Master Items List07-25-2011RPS11-0100-09Master Items List10-31-2016RPS16-0300-10Master Items List07-31-2021RPS21-0100-11Master Items List08-16-2021RPS21-0200-12Master Items List06-15-2015RPS15-0100-13Master Items List03-10-2010RPS10-0100-14Master Items List07-31-2021RPS21-0100-15Master Items List06-15-2015RPS15-01 00 - General Layout NumberLayout NameIssue Or Last Revision DateLatest Bulletin No01 - Instruction01-10Typical Pre-Kindergarten04-30-2025RPS25-0201-10ETypical Pre-Kindergarten-Elevations04-30-2025RPS25-0201-11Typical Kindergarten04-30-2025RPS25-0201-11ETypical Kindergarten-Elevations04-30-2025RPS25-0201-12Classroom Grades 1-2 w/ Toilet04-30-2025RPS25-0201-12EClassroom Grades 1-2 w/ Toilet - Elevations04-30-2025RPS25-0201-13Learning Classroom, Grades 1-2 w/ toilet04-30-2025RPS25-0201-14Typical Classroom, Grade 304-30-2025RPS25-0201-15Typical Classroom, Grades 4-504-30-2025RPS25-0201-16Typical Classroom, Grades 6-804-30-2025RPS25-0201-17Typical Classroom, Grades 6-8 Alt 104-30-2025RPS25-0201-19Typical Classroom, Grades 6-8-Alt 204-30-2025RPS25-0201-20Typical Classroom Grades 9-1204-30-2025RPS25-0201-22Classroom W/ Operable Wall01-02-2013RPS14-0101-23Small Group Instruction Room (For P.S./I.S./H.S.)04-30-2025RPS25-0201-25Typical Classroom Grades 1-204-30-2025RPS25-0202 - Special Education01-30Special Education Classroom (For P.S./I.S./H.S.)04-30-2025RPS25-0201-31Reading Resource Room (For P.S./I.S.)04-30-2025RPS25-0201-32Speech Resource Room (For P.S./I.S./H.S.)04-30-2025RPS25-0201-33Special Ed. L.D. Resource Room07-31-2021RPS21-0101-34Resource Room with Operable Wall07-31-2021RPS21-0101-40Speech Workshop w/ operable wall01-02-2014RPS14-0101-41Reading Resource Room (For H.S.)04-30-2025RPS25-0201-42Special Ed. Resource Room01-02-2014RPS14-01 01 - Instruction Layout NumberLayout NameIssue Or Last Revision DateLatest Bulletin No04 - Art02-10Art Classroom (For P.S/I.S)04-30-2025RPS25-0202-10EArt Classroom-Elevations04-30-2025RPS25-0202-11Art Storeroom (For P.S/I.S)04-30-2025RPS25-0202-20Art Classroom W/ Storage (For H.S.)04-30-2025RPS25-0202-20EArt Classroom W/ Storage-Elevations04-30-2025RPS25-0202-21Art Studio W/ Storage (For H.S.)04-30-2025RPS25-0202-21EArt Studio W/ Storage-Elevations04-30-2025RPS25-0202-23Project Room (For P.S.)04-30-2025RPS25-0202-24Project Room (For P.S.)04-30-2025RPS25-0202-25Art Classrook With Storage (For P.S./I.S.)04-30-2025RPS25-0202-25EArt Classrook With Storage Elevations04-30-2025RPS25-0205 - Music02-30Music Suite03-30-2018RPS18-0202-30.1Music Classroom03-30-2018RPS18-0202-30.2Small Practice Cubicle03-30-2018RPS18-0202-30.3Large Practice Cubicle03-30-2018RPS18-0202-30.4Instrument Storeroom03-30-2018RPS18-0202-31Music Classroom W/ Storeroom (For PS, PS/IS, IS)05-31-2024RPS24-0102-32Choral Music Classroom03-10-2010RPS10-0102-32EChoral Music Classroom-Elevations03-10-2010RPS10-0102-40Instrument Practice Room07-01-2008RPS08-0202-40EInstrument Practice Room-Elevations07-01-2008RPS08-0202-42Orchestral Room W/ Local Sound System11-23-2005RPS05-0102-42EOrchestral Room W/ Local Sound System-Elevations11-23-2005RPS05-0102-43Choral Room w/ Music Storage & Local Sound System11-23-2005RPS05-0102-43EChoral Room w/ Music Storage and Local Sound System-Elevations11-23-2005RPS05-0102-44Music Instrument Storage04-30-2025RPS25-0206 - Technology02-50Wireless Language Lab11-23-2005RPS05-0102-51Materials Processing Lab and Storeroom11-23-2005RPS05-0102-51EMaterials Processing Lab-Elevations11-23-2005RPS05-0102-52Electronics Lab11-23-2005RPS05-0102-52EElectronics Lab-Elevations11-23-2005RPS05-0102-53Culinary Arts Classroom (For I.S./H.S.)11-29-2024RPS24-0202-54Culinary Arts Storeroom11-23-2005RPS05-0102-60Program Instruction / Language Lab11-23-2005RPS05-0102-60EProgram Instruction / Language Lab-Elevations11-23-2005RPS05-0102-61Distance Learning Classroom11-23-2005RPS05-0102-61EDistance Learning Classroom-Elevations11-23-2005RPS05-0102-61EDistance Learning Classroom-Elevations11-23-2005RPS05-0102-62Transportation Lab11-23-2005RPS05-0102-62ETransportation Lab11-23-2005RPS05-0102-62E1Transportation Lab-Elevations11-23-2005RPS05-0102-63Communications Technology Lab11-23-2005RPS05-0102-63ECommunications Technology Lab-Elevations11-23-2005RPS05-0102-64Materials Processing Lab11-23-2005RPS05-0102-64EMaterials Processing Lab -Elevations11-23-2005RPS05-0102-65Electronics Lab11-23-2005RPS05-0102-65EElectronics Lab-Elevations11-23-2005RPS05-0102-66CADD/Drafting Lab11-23-2005RPS05-0102-66ECADD/Drafting Lab-Elevations11-23-2005RPS05-0102-67CADD/Hand Drafting Lab11-23-2005RPS05-0102-67ECADD/Hand Drafting Lab-Elevations11-23-2005RPS05-0102-68Mechanical Drafting Lab11-23-2005RPS05-0102-68EMechanical Drafting Lab-Elevations11-23-2005RPS05-0102-69Virtual Enterprise Lab11-23-2005RPS05-0102-69EVirtual Enterprise Lab-Elevations11-23-2005RPS05-0102-80Stagecraft Lab11-23-2005RPS05-0102-80EStagecraft Lab-Elevations11-23-2005RPS05-0102-81Culinary Arts Lab11-29-2024RPS24-0202-81ECulinary Arts Lab-Elevations11-29-2024RPS24-0202-82Photography Lab11-23-2005RPS05-0102-82EPhotography Lab-Elevations11-23-2005RPS05-0102-82E1Photography Lab-Elevations11-23-2005RPS05-0102-83Technology Storeroom11-23-2005RPS05-01 02 - Specialized Instruction Layout NumberLayout NameIssue Or Last Revision DateLatest Bulletin No07 - Science03-10Science Resource Room (For P.S.)04-30-2025RPS25-02R03-11Science Resource Prep Room and Stor. (For P.S.)11-29-2024RPS24-0203-12Science Resource Room with Stor. (For P.S.)04-30-2025RPS25-0203-13Science Resource Room - Alt. 1 (For P.S.)04-30-2025RPS25-0203-14Science Laboratory/Demo (For I.S.)04-30-2025RPS25-0203-14EScience Laboratory/Demo-Elevations (For I.S.)04-30-2025RPS25-0203-15Science Prep Room (For I.S.)11-29-2024RPS24-0203-20Standard Trifacial Laboratory (For H.S.)04-30-2025RPS25-0203-20EStandard Trifacial Laboratory-Elevations04-30-2025RPS25-0203-21Standard Trifacial Laboratory-Biology07-01-2008RPS08-0203-21EStandard Trifacial Laboratory-Biology-Elevations07-01-2008RPS08-0203-22Biology Project Preparation Room05-31-2007RPS07-0303-22EBiology Project Preparation Room-Elevations05-31-2007RPS07-0303-23Chemistry / Physics Project Prep Room05-31-2007RPS07-0303-23EChemistry / Physics Project Prep Room-Elevations05-31-2007RPS07-0303-24Science Demonstration Room (For H.S.)04-30-2025RPS25-0203-24EScience Demonstration Room-Elevations04-30-2025RPS25-0203-25Science Lecture Room05-31-2007RPS07-0303-25EScience Lecture Room-Elevations05-31-2007RPS07-0303-26Science Lecture Room05-31-2007RPS07-0303-26EScience Lecture Room -Elevations05-31-2007RPS07-0303-27Trifacial Lab Demonstration Room05-31-2007RPS07-0303-27ETrifacial Lab Demonstration Room-Elevations05-31-2007RPS07-0303-28Standard Physics Laboratory05-31-2007RPS07-0303-28EStandard Physics Laboratory-Elevations05-31-2007RPS07-0303-29Standard Chemistry Laboratory05-31-2007RPS07-0303-29EStandard Chemistry Laboratory-Elevations05-31-2007RPS07-0303-40Double Quad Laboratory (For H.S.)04-30-2025RPS25-0203-40EDouble Quad Laboratory-Elevations04-30-2025RPS25-0203-41Plant Room05-31-2007RPS07-0303-42Science Project / Prep Room (For H.S.)11-29-2024RPS24-02 03 - Science Layout NumberLayout NameIssue Or Last Revision DateLatest Bulletin No08 - Physical Education04-00Gymnasium and Gymatorium Design Conceepts/Application Chart04-30-2025RPS25-02R04-20Competition Gymnasium04-30-2025RPS25-02R04-20ECompetition Gymnasium-Elevations04-30-2025RPS25-02R04-20E1Competition Gymnasium-Elevations04-30-2025RPS25-02R04-23Dance Studio12-01-2017RPS17-0304-23EDance Studio-Elevations12-01-2017RPS17-0304-24Weight Training11-23-2005RPS05-0104-24CWeight Training-Ceiling11-23-2005RPS05-0104-24EWeight Training-Elevations11-23-2005RPS05-0104-25Wrestling Gymnasium11-23-2005RPS05-0104-25CWrestling Gymnasium-Elevations11-23-2005RPS05-0104-25EWrestling Gymnasium-Ceiling11-23-2005RPS05-0104-26Gymnastics Gymnasium11-23-2005RPS05-0104-26EGymnastics Gymnasium-Elevations11-23-2005RPS05-0104-27Competition Pool11-23-2005RPS05-0104-27ECompetition Pool-Elevations11-23-2005RPS05-0104-29Exercise Room05-31-2024RPS24-0104-29EExercise Room-Elevations05-31-2024RPS24-0104-30Locker Room07-31-2021RPS21-0104-30CLocker Room -Ceiling11-23-2005RPS05-0104-31Student Locker Room M/F w/ Toilets07-31-2021RPS21-0104-31EStudent Locker Room M/F w/ Toilets-Elevations07-31-2021RPS21-0104-40Student Locker Room w/ Showers, Toilets-M/F03-02-2007RPS07-0204-40CStudent Locker Room w/ Showers, Toilets-M/F-Ceiling11-23-2005RPS05-0104-40EStudent Locker Room w/ Showers, Toilets-M/F-Elevations03-02-2007RPS07-0204-40E1Student Locker Room w/ Showers, Toilets-M/F-Ceiling11-23-2005RPS05-0104-41Locker Room W/ Showers Visiting Team04-17-2012RPS12-0104-42Pool Locker Rooms11-23-2005RPS05-0104-42CPool Locker Rooms-Ceiling11-23-2005RPS05-0104-42EPool Locker Rooms-Elevations11-23-2005RPS05-0104-43Shower Room11-23-2005RPS05-0104-50Health Instructor's Office (Small)12-05-2014RPS14-0204-51Health Instructor's Office w/ Storage11-23-2005RPS05-0104-52Health Instructor's Office11-23-2005RPS05-0104-52EHealth Instructor's Office-Elevations11-23-2005RPS05-0104-53Gym Storeroom (Small)11-23-2005RPS05-0104-54Gym Storeroom06-15-2015RPS15-0104-55Health Instructor's Office without shower11-23-2005RPS05-0104-60Competition Gymatorium w/ Telescoping Seating04-30-2025RPS25-02R04-60ECompetition Gymatorium-Elevations04-30-2025RPS25-02R04-60E1Competition Gymatorium-Elevations04-30-2025RPS25-02R04-80Gymatorium (Small) with Telescoping Seating04-30-2025RPS25-02R04-80EGymatorium (Small) with Telescoping Seating-Elevations04-30-2025RPS25-02R04-84Gymatorium (Large) with Telescoping Seating04-30-2025RPS25-02R04-84EGymatorium (Large) with Telescoping Seating- Elevations04-30-2025RPS25-02R 04 - Physical Education Layout NumberLayout NameIssue Or Last Revision DateLatest Bulletin No09 - Assembly Areas05-10Assembly Design Concept12-01-2017RSP17-0305-11Assembly Design Concepts11-23-2005RPS05-0105-12Dressing Room11-23-2005RPS05-0105-13Assembly Storeroom11-23-2005RPS05-0105-20Assembly Area 300 Seats11-23-2005RPS05-0105-20EAssembly Area 300 Seats-Elevations11-23-2005RPS05-0105-20E1Assembly Area 300 Seats-Elevations11-23-2005RPS05-0105-30Assembly Area 300 Seats11-23-2005RPS05-0105-30EAssembly Area 300 Seats-Elevations11-23-2005RPS05-0105-30E1Assembly Area 300 Seats-Elevations11-23-2005RPS05-0105-40Assembly Area 300 Seats11-23-2005RPS05-0105-40EAssembly Area 300 Seats -Elevations11-23-2005RPS05-0105-40E1Assembly Area 300 Seats -Elevations11-23-2005RPS05-0105-40E2Assembly Area 300 Seats-Elevations11-23-2005RPS05-0105-50Auditorium 550 Seats04-30-2025RPS25-0205-50CAuditorium Ceiling Plan04-30-2025RPS25-0205-50EAuditorium Elevations, 550 Seats04-30-2025RPS25-0205-50E1Auditorium Accessory Spaces - Elevations11-29-2024RPS24-0205-50E2Auditorium Dressing Rooms - Elevations04-30-2025RPS25-0205-60EAssembly Area 550 Seats-Stadium Layout-Elevations11-23-2005RPS05-0105-60E1Assembly Area 550 Seats-Stadium Layout-Elevations11-23-2005RPS05-0105-60P1Assembly Area 550 Seats-Stadium Layout-Lower Level11-23-2005RPS05-0105-60P2Assembly Area 550 Seats-Stadium Layout-Upper Level11-23-2005RPS05-0105-60SAssembly Area 550 Seats-Stadium Layout-Section11-23-2005RPS05-01 05 - Assembly Areas Layout NumberLayout NameIssue Or Last Revision DateLatest Bulletin No10 - Libraries06-10Early Childhood Library11-01-2008RPS08-0306-13Library (PS)04-30-2020RPS20-0106-14Library (PS) all Tables /Chair Seating04-30-2020RPS20-0106-15Library PS, PS/IS04-30-2020RPS20-0106-16Library (For PS, PS/IS, IS, IS/HS, HS)05-31-2024RPS24-0106-17Library Large PS, PS/IS04-30-2020RPS20-0106-18Library (For IS, IS/HS, HS)05-31-2024RPS24-0106-20Library/ Media Center11-23-2005RPS05-0106-20ELibrary/ Media Center-Elevations11-23-2005RPS05-0106-20E1Library/ Media Center-Elevations11-23-2005RPS05-0106-21Library/ Media Center & AV Storage11-23-2005RPS05-0106-21CLibrary/ Media Center & AV Storage-Ceiling11-23-2005RPS05-0106-21ELibrary/ Media Center & AV Storage-Elevations11-23-2005RPS05-0106-21E1Library/ Media Center & AV Storage-Elevations11-23-2005RPS05-01 06 - Libraries Layout NumberLayout NameIssue Or Last Revision DateLatest Bulletin No11 - Circulation07-10Lobby Design criteria05-31-2024RPS24-0107-20Play Yard Entrance/Exit04-30-2025RPS25-0207-21Lobby with Cycle Parking & Security Station05-31-2024RPS24-0107-40Typical Corridor w/ Lockers (For IS, IS/HS, HS)05-31-2024RPS24-0107-40ETypical Corridor w/ Lockers-Elevations05-31-2024RPS24-01 07 - Circulation Layout NumberLayout NameIssue Or Last Revision DateLatest Bulletin No12 - Pupil Personnel Services08-10Guidance Suite-Small04-30-2025RPS25-0208-10EGuidance Suite (Small) - Elevations04-30-2025RPS25-0208-13Guidance Office11-23-2005RPS05-0108-20Guidance House11-23-2005RPS05-0108-20EGuidance House11-23-2005RPS05-0108-21Guidance Suite11-23-2005RPS05-0108-22College & Vocational Guidance Office11-23-2005RPS05-0108-22ECollege & Vocational Guidance Office-Elevations11-23-2005RPS05-0108-30School Based Support Team (SBST) Suite (Small)04-30-2025RPS25-0208-30ESchool Based Support Team (SBST) Suite (Small) - Elevations04-30-2025RPS25-0208-40SBST Suite (Medium)11-23-2005RPS05-0108-41SBST Suite (Large)11-23-2005RPS05-0108-41ESBST Suite (Large) - Elevations11-23-2005RPS05-0108-42LYFE Center Suite07-25-2011RPS11-0108-42ELYFE Center Suite-Elevations07-25-2011RPS11-0108-43Government & Club House11-23-2005RPS05-0108-43EGovernment & Club House-Elevations11-23-2005RPS05-0108-44Records Room11-23-2005RPS05-0108-45Student Store11-23-2005RPS05-0108-46Student Services Suite11-23-2005RPS05-0108-46EStudent Services Suite-Elevations11-23-2005RPS05-0108-46E1Student Services Suite-Elevations11-23-2005RPS05-0108-47Lateness & Attendance Office11-23-2005RPS05-0108-48Assistant Principal's Guidance Office11-23-2005RPS05-0108-49A.P. Guidance Secretary11-23-2005RPS05-0108-50Medical Suite-Small Elevations04-30-2025RPS25-0208-50EMedical Suite-Small04-30-2025RPS25-0208-51Medical Suite - Medium04-30-2025RPS25-0208-51EMedical Suite - Medium Elevations04-30-2025RPS25-02 08 - Pupil Personnel Services Layout NumberLayout NameIssue Or Last Revision DateLatest Bulletin No13 - Storage0-17Receiving and General Storage04-30-2020RPS20-0109-10Book Storeroom (Small)11-23-2005RPS05-0109-11Book Storeroom (Large)11-23-2005RPS05-0109-12Large Book Storeroom11-23-2005RPS05-0109-13Small Book Storeroom11-23-2005RPS05-0109-15Furniture Storeroom (Large)04-30-2020RPS20-0109-15EFurniture Storeroom (Large)-Elevations04-30-2020RPS20-0109-16Receiving and General Supply Room11-23-2005RPS05-0109-16EReceiving and General Supply Room Elevations11-23-2005RPS05-0109-18Year Round Storage Room11-23-2005RPS05-0109-19Grounds Equipment Storeroom11-23-2005RPS05-0109-20Grounds Equipment Storeroom (Large)04-30-2020RPS20-0109-21Audio Visual/Secure Storeroom11-23-2005RPS05-0109-22Vault04-30-2020RPS20-0109-23Vault w/ Anteroom04-30-2020RPS20-0109-23EVault w/ Anteroom04-30-2020RPS20-0109-24Refuse and Recycling Storage01-02-2019RPS19-0109-25Computer / AV Storeroom08-30-2006RPS06-0145914Furniture Storeroom04-30-2020RPS20-01 09 - Storage Layout NumberLayout NameIssue Or Last Revision DateLatest Bulletin No14 - Administration10-10General Office / Waiting/Mail/Duplicating07-31-2021RPS21-0110-11General Office / Waiting01-31-2017RPS17-0110-11EGeneral Office / Waiting-Elevations01-31-2017RPS17-0110-12Principal's Office03-10-2010RPS10-0110-12EPrincipal's Office-Elevations03-10-2010RPS10-0110-13Principal's Office w/o Toilet03-10-2010RPS10-0110-14Records Room04-30-2025RPS25-0210-15Principal's Office w/Toilet08-16-2021RPS21-0210-16Duplicating Room w/ lockers11-23-2005RPS05-0110-17Duplicating Room07-31-2017RPS17-0210-17Duplicating Room07-31-2017RPS17-0210-18Supervisory Office with Storeroom11-23-2005RPS05-0110-18Supervisory Office with Storeroom11-23-2005RPS05-0110-19A.P. For Administration Office W/ Storage11-23-2005RPS05-0110-20Supervisor's Office W/ Conference and Storage11-23-2005RPS05-0110-20ESupervisor's Office W/ Conference and Storage-Elevations11-23-2005RPS05-0110-21Program Office11-23-2005RPS05-0110-22Teachers Mail & Time Room11-23-2005RPS05-0110-23Treasurer's Office11-23-2005RPS05-0110-23Treasurer's Office11-23-2005RPS05-0110-24Teacher's/Aide's Workroom w/Toilet11-29-2019RPS19-0310-25Community Activities/Parents Room11-23-2005RPS05-0110-26Parent/Community Office11-23-2005RPS05-01 10 - Administration Layout NumberLayout NameIssue Or Last Revision DateLatest Bulletin No15 - Cafeteria / Lunch11-10Student's Cafeteria/Multipurpose Room01-02-2019RPS19-0111-10CStudent's Cafeteria/Multipurpose Room-Ceiling11-23-2005RPS05-0111-11Staff Lunch/Conference Room (Small)11-23-2005RPS05-0111-12Staff Lunch/Conference Room (Large)11-23-2005RPS05-0111-13Staff Lunch Room11-23-2005RPS05-0111-13Staff Lunch Room11-23-2005RPS05-0111-20Staff Dining w/ Servery11-23-2005RPS05-0111-41Cafeteria with Banquet Seating11-29-2024RPS24-0211-41ECafeteria with Banquet Seating Elevations11-29-2024RPS24-02 11 - Cafeteria / Lunch Layout NumberLayout NameIssue Or Last Revision DateLatest Bulletin No16 - Plant Operations12-11Custodian's Office03-30-2018RPS18-0212-12Custodian's Office w/Storage03-30-2018RPS18-0212-13Custodian's Storeroom (Small)11-23-2005RPS05-0112-14Custodian's Storeroom (Medium)04-17-2012RPS12-0112-14Custodian's Storeroom (Medium)04-17-2012RPS12-0112-15Custodian's Storeroom (Large)11-23-2005RPS05-0112-16Custodian's Workshop11-29-2024RPS24-0212-17Janitor's Sink Closet11-29-2019RPS19-0312-18Girls Restroom and Boys Restroom12-01-2017RPS17-0312-20Custodian's Locker Room w/ Toilet & Shower11-29-2024RPS24-0212-21Security Officers Changing Room M/F11-23-2005RPS05-0112-21Security Officers Changing Room M/F11-23-2005RPS05-0112-22Shower and Changing room with Lockers11-29-2024RPS24-0212-23Custodian Staff Locker Room07-31-2021RPS21-0112-25DIIT Large School Main Telecommunication Room Closet07-31-2021RPS21-0112-26Telecommunications Closet01-02-2014RPS14-0112-27Staff All Gender Toilet11-29-2024RPS24-0212-28School Safety Administration (SSA) Office and Locker Rooms05-31-2007RPS07-0312-28School Safety Administration (SSA) Office and Locker Rooms05-31-2007RPS07-0312-29All Gender Access Toilet11-29-2024RPS24-0212-30Student All Gender Toilet11-29-2024RPS24-0212-31DIIT Medium School Main Telecommunication Room 12 - Plant Operations Layout NumberLayout NameIssue Or Last Revision DateLatest Bulletin NoCW - Citywide SpecialCW10-10Special Education Classroom07-31-2021RPS21-01CW10-11Special Education Classroom (Large)04-30-2020RPS20-01CW10-12Special Education Classroom - Alt 101-31-2017RPS17-01CW10-13Special Education Classroom w/ Lockers (IS/HS Program)04-30-2020RPS20-01CW10-14Special Education Classroom w/o Toilets (IS/HS Program)01-31-2017RPS17-01CW10-15Special Education Classroom (IS/HS Program)04-30-2020RPS20-01CW12-10Changing Room04-30-2020RPS20-01CW16-30Activities for Daily Living01-31-2017RPS17-01CW16-30Activities for Daily Living11-29-2019RPS19-03CW16-30EActivities for Daily Living-Elevations11-29-2019RPS19-03CW17-12Speech Room01-31-2017RPS17-01CW30-00Guidance Office07-31-2021RPS21-01CW30-80Guidance Storeroom01-31-2017RPS17-01CW34-00Occupational Therapy/Physical Therapy01-31-2017RPS17-01CW40-70Administration Office & Storage01-31-2017RPS17-01CW80-00Storage Room01-31-2017RPS17-01 CW - Citywide Special Layout NumberLayout NameIssue Or Last Revision DateLatest Bulletin NoK - Kitchen ServicesK1Adjacency Diagram and Space Requirements05-31-2024RPS24-01K2Cooking, Preparation, Can Wash & Pot Wash Layouts and Schedule07-31-2019RPS19-02K3Student Servery Layout and Schedule05-31-2024RPS24-01K4Temporary Kitchen - Layout & Schedule01-31-2013RPS13-01K5Small Kitchen (<400 Students) Layout & Schedule05-31-2024RPS24-01K6Dieticians/Managers Office07-31-2021RPS21-01K8Kitchen Staff Locker Room K - Kitchen Services Layout NumberLayout NameIssue Or Last Revision DateLatest Bulletin No03K - 3K Standards3K 01-103k Typical Classroom11-29-2019RPS19-033K 04-103K Exercise Room RPS18-053K 07-103K Lobby05-01-2018RPS18-033K 08-523K Nurses Office05-01-2018RPS18-033k 08-533K Medical Office07-30-2021RPS21-013K 09-193K Grounds Equipment Storage05-01-2018RPS18-033K 10-113K General Office/Mail/Time/Duplicating08-31-2018RPS18-053K 10-133K Principals Office08-16-2021RPS21-023K 10-153K Principals Office w/ Conf Area08-16-2021RPS21-023K 10-253K Parents/Community Room05-01-2018RPS18-033K 10-273K Staff Room06-29-2018RPS18-043K 12-113K Custodians Office05-01-2018RPS18-033K 12-253K Telecommunications Closet05-01-2018RPS18-033K 12-253K Telecommunications Closet05-01-2018RPS18-033K K23k Warming Pantry08-16-2021RPS21-02 03K - 3K Standards Layout NumberLayout NameIssue Or Last Revision DateLatest Bulletin NoUPK - UPK StandardsUPK 01-10Typical UPK Classroom11-29-2019RPS19-03UPK 07-10UPK Lobby Design Criteria07-11-2014 UPK 08-53UPK Medical Office07-31-2021RPS21-01UPK 09-16Receiving and General Supply Room06-20-2014 UPK 09-19UPK Grounds Equipment Closet07-11-2014 UPK 09-24Refuse and Recycling Storage06-24-2014 UPK 10-11UPK General Office/Waiting Room07-11-2014 UPK 10-13UPK Principals Office08-16-2021RPS21-02UPK 10-15UPK Principals Office w/ Conf Area08-16-2021RPS21-02UPK 10-25UPK Community Activities/Parents Room07-11-2014 UPK 10-27UPK Staff Room06-29-2018RPS18-04UPK 12-11UPK Custodian's Office06-20-2014 UPK 12-16UPK Custodian's Workshop/Office UPK 12-25UPK Telecommunications07-11-2014 UPK K2UPK Warming Pantry08-16-2021RPS21-02 UPK - UPK Standards Layout NumberLayout NameIssue Or Last Revision DateLatest Bulletin No 01-18Typical Kindergarten-Alt 103-10-2010RPS10-0101-18ETypical Kindergarten-Alt 1-Elevations03-10-2010RPS10-0104-10Gymnasium (Small)11-29-2019RPS19-0304-10EGymnasium (Small)-Elevations11-29-2019RPS19-0304-10E1Gymnasium (Small)-Elevations12-01-2017RPS17-0304-11Auxiliary Gym and Storeroom11-23-2005RPS05-0104-11EAuxiliary Gym and Storeroom-Elevations11-29-2019RPS19-0304-12Gymnasium12-01-2017RPS17-0304-12EGymnasium-Elevations12-01-2017RPS17-0304-12E1Gymnasium-Elevations12-01-2017RPS17-0304-21Practice Gymnasium03-10-2010RPS10-0104-21EPractice Gymnasium-Elevations03-10-2010RPS10-0104-21E1Practice Gymnasium-Elevations03-10-2010RPS10-0104-22Auxiliary Gymnasium11-23-2005RPS05-0104-22EAuxiliary Gymnasium-Elevations11-23-2005RPS05-0104-70Gymatorium07-25-2011RPS11-0104-70EGymatorium Elevations07-25-2011RPS11-0104-70E1Gymatorium Elevations07-25-2011RPS11-0104-90Gymatorium (Small)11-30-2007RPS07-0404-90EGymatorium Elevations11-30-2007RPS07-0408-10.1Guidance Offices07-31-2021RPS21-0108-10.2Guidance Conference Room07-31-2021RPS21-0108-10.3Guidance Storeroom07-31-2021RPS21-0108-10.4Guidance Waiting Room07-31-2021RPS21-0108-11Guidance Suite (Medium)11-23-2005RPS05-0108-11.1Guidance Offices11-23-2005RPS05-0108-11.2Guidance Conference Room11-23-2005RPS05-0108-11.3Guidance Closet11-23-2005RPS05-0108-11.4Guidance Waiting Room11-23-2005RPS05-0108-12Guidance Suite-Large11-23-2005RPS05-0108-12.1Guidance Offices11-23-2005RPS05-0108-12.1EGuidance Offices-Elevations11-23-2005RPS05-0108-12.2Guidance Conference Room11-23-2005RPS05-0108-12.3Guidance Storeroom11-23-2005RPS05-0108-12.4Guidance Waiting Room11-23-2005RPS05-0108-30.1SBST Office07-31-2021RPS21-0108-30.2SBST Conference Room07-31-2021RPS21-0108-30.3SBST Waiting Room07-31-2021RPS21-0108-31SBST Suite w/o storage11-23-2005RPS05-0108-31.1SBST Office11-23-2005RPS05-0108-31.2SBST Conference Room11-23-2005RPS05-0108-31.3SBST Waiting Room11-23-2005RPS05-0108-32SBST Suite w/ storage11-23-2005RPS05-0108-32.1SBST Office11-23-2005RPS05-0108-32.2SBST Conference Room11-23-2005RPS05-0108-32.3SBST Storeroom11-23-2005RPS05-0108-32.4SBST Waiting Room11-23-2005RPS05-0108-50.1Medical Suite Toilet12-01-2017RPS17-0308-50.2Medical Suite Nurses Office07-31-2021RPS21-0108-50.3Medical Suite Examination Room12-01-2017RPS17-0308-50.4Medical Suite Waiting Room12-01-2017RPS17-0308-60Medical Suite-large11-23-2005RPS05-0108-60EMedical Suite-large-Elevations11-23-2005RPS05-0108-61School Based Health Clinic03-02-2007RPS07-0208-61ESchool Based Health Clinic03-02-2007RPS07-0208-61E1School Based Health Clinic03-02-2007RPS07-02 Group X - Older Versions Specifications The Standard Specifications define the materials acceptable for use in New York City Public Schools, and are based on and complement the Design Requirements. For projects that have a system that is not included in the specification, the designer is to create the section based on the formatting. Deviations from the standards on capacity projects must be approved through the Deviations Committee.During construction submittal review, Designers are to review materials/products for their projects based on the performance criteria included in the specifications. Those items listed in the specifications can meet the performance criteria but “or Equal” products are permitted to be submitted by the Contractor as per the General Conditions and are to be reviewed by designers. Refer to Procedural Guideline 5.3.1. For a list of products that have been deemed by the Authority to not be considered “or Equal” and are thus not to be approved on a project, please click on the following link: “List of Products Deemed Not Equal”. Designers are also to ensure they do not include the items from the list in their design specifications when creating project specifications.The Standard Specifications are available in Word format and are to be edited as applicable for all projects.General Requirements in Division 1 are not to be changed, revised, edited or omitted for projects.Supplementary Requirements in Division 1 are to be edited as required for the project.In order to view the Standard Specifications, you must download it.The 2022 NYC Construction Codes were effective as of November 7, 2022. For the complete set of Standard Specifications issued prior to the 2022 code revisions, please scroll down to the Pre-2022 NYC Construction Codes Standards Section.Complete List of Standard Specifications Title Sheet All Drawings prepared for the SCA shall use the Standard Title Sheets to ensure consistency in presentation for all projects. The Designer shall use the appropriate sheet size and border for the project, with 24½"x 36½" being the preferred size.In order to view the Standard Title Sheets, you will need a PDF reader installed on your machine. If you do not already have it, you can download one free of charge from Adobe's website by clicking the following link: Adobe PDF Reader. Detail NameDetail TitleIssue or Last Revision DateLatest Bulletin NoTitle Sheetssht-a8 1/2" X 11" Border Sheet - Portrait02-09-2009SD09-01sht-a-txtText To Be Inserted Into Title Block for 'A' Size Sheet - Portrait02-09-2009 SD09-01sht-a-wide8 1/2" X 11" Border Sheet - Landscape02-09-2009 SD09-01sht-a-wide-txtText To Be Inserted Into Title Block for 'A' Size Sheet - Landscape02-09-2009 SD09-01sht-b11" X 17" Border Sheet - Portrait02-09-2009 SD09-01sht-b-txtText To Be Inserted Into Title Block for 'B' Size Sheet - Portrait02-09-2009 SD09-01sht-b-wide11" X 17" Border Sheet - Landscape02-09-2009 SD09-01sht-b-wide-txtText To Be Inserted Into Title Block for 'B' Size Sheet - Landscape02-09-2009 SD09-01Title Sheets to be used for Capacity and CIP Projectssht-d-bt24" X 36" Border Sheet - Bottom Title Block06-16-2025 AE25-10sht-d-bt-txtText To Be Inserted Into Title Block for 'D' Size Sheet -Bottom Title Block11-29-2024 AE24-10sht-d-st24" X 36" Border Sheet - Side Title Block06-16-2025 AE25-10sht-d-st-txtText To Be Inserted Into Title Block for 'D' Size Sheet -Side Title Block11-29-2024 AE2024-10sht-e1-bt30" X 42" Border Sheet - Bottom Title Block06-16-2025 AE25-10sht-e1-bt-txtText To Be Inserted Into Title Block for 'E1' Size Sheet -Bottom Title Block11-29-2024 AE2024-10sht-e1-st30" X 42" Border Sheet - Side Title Block06-16-2025 AE25-10sht-e1-st-txtText To Be Inserted Into Title Block for 'E1' Size Sheet -Side Title Block11-29-2024 AE2024-10 Pre-2022 NYC Construction Codes Standards Page 0.0 - Cover0.3 - Table of Contents1.0 - General2.0 - Site Construction3.0 - Structural4.0 - Building Envelope5.0 - Interiors7.0 - Electrical and Communication Services8.0 - Sustainability and Resiliency Design Requirements Details 00 - General Room Layouts01 - Standard Instruction Room Layouts02 - Specialized Instruction Room Layouts03 - Science Room Layouts04 - Physical Education Room Layouts05 - Assembly Areas Room Layouts06 - Libraries Room Layouts07 - Circulation Room Layouts08 - Pupil Personnel Services Room Layouts09 - Storage Room Layouts10 - Administration Room Layouts11 - Cafeteria / Lunch Room Layouts12 - Plant Operations Room LayoutsCitywide Special Room LayoutsKitchen Services Room Layouts3K Standards Room LayoutsUPK Standards Room Layouts Room Layouts 01 - General and Supplementary Requirements02 - Sitework03 - Concrete04 - Masonry05 - Metals06 - Wood and Plastics07 - Thermal and Moisture Protection09 - Finishes10 - Specialties08 - Doors and Windows11 - Equipment12 - Furnishings13 - Special Construction15 - Fire Protection Systems15 - Plumbing and Drainage15 - Heating, Ventilating and Air Conditioning16 - Electrical Specifications Titel Sheets [ - NO SECTION SELECTED - ]