Page Contents
Page Contents
Design Requirements and Worksheets
Included in the download are the Design Requirements, Typical Room Finishes, Program of Requirements (POR) and Toilets and Drinking Fountains worksheets for the UPK and 3K Program. There is a single POR worksheet that is used for both new Pre-K centers and for fit-out of existing buildings.
Pre-K Design Requirements and Worksheets
3K
- 3K Design Process
- 3K Considerations
- 3K Design Requirements
- 3K Program of Requirement - Fit-Out or New Building
- 3K Medical Suite Checklist
- 3K Proposal Template
3K/UPK
- 3K/UPK Room Planning Standards
- 3K/UPK HVAC System Selection Matrix
- Early Learn - 3K - Pre-K Comparison Sheet
- UPK Logo and Signage Detail
- UPK Toilets and Drinking Fountains Worksheet
- DEP Grease Trap Approval Request Letter
UPK
- UPK Considerations
- UPK Design Requirements
- UPK Program of Requirement - Fit Out or New Building
- UPK Sample Feasibility/Field Report
.png%3Fh%3D352%26iar%3D0%26w%3D728&w=1920&q=85)